TEXAS · WELLS · LOVING COUNTY · CBR 10-3A-56-1 LEASE · API 42-301-34941 · DISTRICT 7B
CBR 10-3A-56-1 #331H
Loving County · Sandbar (Bone Spring) field · Producing · Horizontal
Cbr 10-3a-56-1 #331H (API 42-301-34941) is a horizontal well in Loving County operated by Wpx Energy Permian LLC, completed September 2, 2020 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued January 13, 2020, permitted to 9,587 ft.
Completion filings report 10 formation tops, including Bell Canyon, Delaware, Cherry Canyon, Brushy Canyon.
Its lease has reported 574K barrels of oil and 2.32M mcf of gas since September 2020, last reporting volume in March 2026.
Operator of record
- Based in
- Oklahoma City, OK
- P-5 status
- Active (A)
- P-5 last filed
- Oct 22, 2025
- Permits on file
- 956
- Phone
- (405) 235-3611
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | WPX Energy Permian LLC |
| Production reports | WPX Energy Permian, LLCthrough Mar 2026 |
| Latest permit | WPX Energy Permian, LLCJan 13, 2020 |
- 9,587
- total depth, ft
- 1
- permits on file
- Jan 13, 2020
- last permit issued
- Sep 2, 2020
- completed
- 574K
- cumulative oil, bbl
- 2.32M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2020 THROUGH Mar 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 2, 2020
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
31.969500, -103.850580 NAD27, as filed
31.969625, -103.851055 WGS84
Permit surface location from the RRC GIS record, referenced to NAD27 as the RRC files it; the WGS84 pair is the same point through NOAA's NADCON grid, and the map link uses it, in Loving County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| CBR 10-3A-56-1 G-10-289869 | Sandbar (Bone Spring) | WPX Energy Permian, LLC | 1 | 574K | 2.32M | Sep 2020 – Mar 2026 |
Gas, mcf lease total
Last 12 months 169,047 · prior 12 138,916(+22%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1WPX Energy Permian, LLCSep 2020 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 860734-99 | Drill | WPX Energy Permian, LLC | Jan 9, 2020 | Jan 13, 2020 | Mar 19, 2020 | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 2, 2020 | CBR 10-3A-56-1 G-10-289869 | Sandbar (Bone Spring) | WPX Energy Permian LLC | Producing | 9,587 |
Formation tops
As filed on W-2/G-1. Subsea from 3,018 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bell Canyon | 3,517 | -499 |
| Delaware | 3,517 | -499 |
| Cherry Canyon | 4,592 | -1,574 |
| Brushy Canyon | 5,710 | -2,692 |
| Bone Spring | 7,374 | -4,356 |
| AtokaATOKA - HIGH PRESSURE | — | — |
| Pennsylvanian | — | — |
| Red Bluff | — | — |
| Strawn | — | — |
| Wolfcamp | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,901 | 20,083 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 3,525 | 12.25 | 1,389 S |
| 7 | 9,832 | 8.75 | 606 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 11, 2020 | Nov 17, 2020 | Yes |
| 00 | Sep 17, 2020 | Sep 9, 2020 | Yes |
Well logs
1 log loaded from the RRC's log index, the latest received Jul 12, 2023. Gamma ray. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| Gamma RaySpans Bone Spring | TIFF | 9,850 to 20,108 | Jul 12, 2023 | 74.1 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-34941 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-34941 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it. The University Lands library has no per-well link: then paste it into its search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbors, subsea-aligned so they line up regardless of surface terrain.
CBR 10-3B-56-142-301-34942
0.0 KM · WPX Energy Permian, LLC · Section with this well →
| Delaware | 3,512 | -494 |
| Bell Canyon | 3,512 | -494 |
| Cherry Canyon | 4,583 | -1,565 |
| Brushy Canyon | 5,701 | -2,683 |
| Bone Spring | 7,376 | -4,358 |
| Atoka | — | |
| Wolfcamp | — | |
| Strawn | — |
10 TOPS · FIRST 8
Bevo 15-56-142-301-35524
0.0 KM · WPX Energy Permian, LLC · Section with this well →
| Bell Canyon | 3,518 | -523 |
| Delaware | 3,518 | -523 |
| Cherry Canyon | 4,609 | -1,614 |
| Brushy Canyon | 5,610 | -2,615 |
| Bone Spring | 7,412 | -4,417 |
| Bone Spring | 8,709 | -5,714 |
| Red Bluff | — | |
| Pennsylvanian | — |
10 TOPS · FIRST 8
Bevo 15-56-142-301-36335
0.0 KM · WPX Energy Permian, LLC · Section with this well →
| Delaware | 3,519 | -524 |
| Bell Canyon | 3,519 | -524 |
| Cherry Canyon | 4,622 | -1,627 |
| Brushy Canyon | 5,625 | -2,630 |
| Bone Spring | 7,423 | -4,428 |
| Bone Spring | 8,706 | -5,711 |
| Bone Spring | 9,443 | -6,448 |
| Wolfcamp | 10,614 | -7,619 |
12 TOPS · FIRST 8
Bevo 15-56-142-301-35525
0.0 KM · WPX Energy Permian, LLC · Section with this well →
| Delaware | 3,520 | -525 |
| Bell Canyon | 3,520 | -525 |
| Cherry Canyon | 4,617 | -1,622 |
| Brushy Canyon | 5,625 | -2,630 |
| Bone Spring | 7,421 | -4,426 |
| Bone Spring | 8,700 | -5,705 |
| Bone Spring | 9,419 | -6,424 |
| Wolfcamp | — |
10 TOPS · FIRST 8
CBR 9-4G-56-142-301-34485
0.5 KM · WPX Energy Permian, LLC · Section with this well →
| Delaware | 3,458 | -478 |
| Bell Canyon | 3,458 | -478 |
| Cherry Canyon | 4,533 | -1,553 |
| Brushy Canyon | 5,657 | -2,677 |
| Bone Spring | 7,321 | -4,341 |
| Pennsylvanian | — | |
| Red Bluff | — | |
| Strawn | — |
10 TOPS · FIRST 8
CBR 9-4K-56-142-301-34484
0.5 KM · WPX Energy Permian, LLC · Section with this well →
| Bell Canyon | 3,471 | -491 |
| Delaware | 3,471 | -491 |
| Cherry Canyon | 4,542 | -1,562 |
| Brushy Canyon | 5,664 | -2,684 |
| Bone Spring | 7,331 | -4,351 |
| Wolfcamp | 10,532 | -7,552 |
| Strawn | — | |
| Atoka | — |
10 TOPS · FIRST 8
Ymc 942-301-34340
0.5 KM · WPX Energy Permian, LLC · Section with this well →
| Bell Canyon | 3,466 | -486 |
| Delaware | 3,466 | -486 |
| Cherry Canyon | 4,540 | -1,560 |
| Brushy Canyon | 5,662 | -2,682 |
| Bone Spring | 7,328 | -4,348 |
| Wolfcamp | 10,532 | -7,552 |
| Strawn | — | |
| Pennsylvanian | — |
11 TOPS · FIRST 8
CBR 9-4J-56-142-301-34336
0.5 KM · WPX Energy Permian, LLC · Section with this well →
| Bell Canyon | 3,483 | -490 |
| Delaware | 3,483 | -490 |
| Cherry Canyon | 4,557 | -1,564 |
| Brushy Canyon | 5,674 | -2,681 |
| Bone Spring | 7,342 | -4,349 |
| Atoka | — | |
| Wolfcamp | — | |
| Red Bluff | — |
10 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30134941, documented in the API reference.