TEXAS · WELLS · LOVING COUNTY · SILVERTIP 76-15 UNIT S LEASE · API 42-301-35571 · DISTRICT 7B

Silvertip 76-15 Unit S #14H

Y

Loving County · Phantom (Wolfcamp) field · Producing  · Horizontal

Silvertip 76-15 Unit S #14H (API 42-301-35571) is a horizontal well in Loving County operated by Anadarko E&P Onshore LLC, completed June 23, 2023 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 9, 2021, permitted to 12,475 ft.

Completion filings report 8 formation tops, including Bell Canyon, Delaware, Red Bluff, Cherry Canyon.

Its lease has reported 1.7M barrels of oil and 2.97M mcf of gas since August 2016, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Anadarko E&P Onshore LLC

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,575
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko E&P Onshore LLC
Production reportsAnadarko E&P Onshore LLCthrough Apr 2026
Latest permitAnadarko E&P Onshore LLCJul 9, 2021
12,475
total depth, ft
1
permits on file
Jul 9, 2021
last permit issued
Jun 23, 2023
completed
1.7M
cumulative oil, bbl
2.97M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2016 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 23, 2023
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Silvertip 76-15 Unit S O-10-48303Phantom (Wolfcamp)Anadarko E&P Onshore LLC31.7M2.97MAug 2016 – Jul 2026

Oil, barrels lease total

Last 12 months 169,637 · prior 12 264,992(-36%)

050K100K202420252026

Gas, mcf lease total

Last 12 months 322,979 · prior 12 460,154(-30%)

050K100K150K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Onshore LLCOct 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
870991-99DrillAnadarko E&P Onshore LLCJul 6, 2021Jul 9, 2021Feb 19, 202314,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 23, 2023Silvertip 76-15 Unit S O-10-48303Phantom (Wolfcamp)Anadarko E&P Onshore LLCProducing12,475

Formation tops

As filed on W-2/G-1. Subsea from 3,223 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon5,111-1,888
Delaware5,111-1,888
Red Bluff6,083-2,860
Cherry Canyon6,129-2,906
Brushy Canyon7,525-4,302
Bone Spring9,181-5,958
Bone Spring2ND BONE SPRING10,453-7,230
Bone Spring3RD BONE SPRING11,196-7,973
Wolfcamp12,194-8,971
Pennsylvanian——

Perforations

Perforated and open-hole intervals.

FromToType
12,92422,901Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,61417.51,835 S
9.62511,92612.252,560 S
712,1018.52,550 S
5.523,0218.52,550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 4, 2024Dec 20, 2023Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30135571, documented in the API reference.