WELL · 42-301-35919 · DISTRICT 8

Ross SWD #9

WaterY

Loving County · Dimmitt (Delaware) field · Injection  · Vertical

Ross Swd #9 (API 42-301-35919) is a well in Loving County operated by Pilot Water Gath Delaware LLC, completed July 14, 2022 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued June 13, 2022, permitted to 7,750 ft.

It was permitted by Pilot Water Solutions Permianllc and has since transferred to Pilot Water Gath Delaware LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Rustler, Delaware, Lamar, Bell Canyon.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 5.31M barrels injected in the 12 months reported through April 2026.

Operator of record

Pilot Water Gath Delaware LLC

Permitted by Pilot Water Solutions Permianllc; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 4, 2026 · 58 permits on file · (432) 699-9366

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePilot Water Gath Delaware LLC
Production reportsnone
Latest permitPilot Water Solutions PermianllcJun 13, 2022

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,750
total depth, ft
1
permits on file
Jun 13, 2022
last permit issued
Jul 14, 2022
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2021 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 14, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ross SWD O-10-56168Dimmitt (Delaware)Pilot Water Gath Delaware LLC500Jul 2021 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
880771-99DrillPilot Water Solutions PermianllcJun 2, 2022Jun 13, 2022Jun 18, 20227,750

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-56168————

Formation tops

As filed on W-2/G-1. Subsea from 3,127 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler9622,165
Delaware5,274-2,147
Lamar5,274-2,147
Bell Canyon5,317-2,190
Cherry Canyon6,385-3,258
Bone Spring——
Brushy Canyon——
Pennsylvanian——
Red Bluff——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
5,3457,700Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,66417.51,420 S
7.6255,3459.8751,225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 17, 2023May 3, 2023—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

5.31M
bbl, last 12 reported months
21.2M
bbl, all reported
Apr 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000124802W-14 DisposalActive24,9002,6505,300–7,700

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 5,311,563 · prior 12 5,194,519(+2%)

0200K400K600K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30135919, documented in the API reference.