TEXAS · WELLS · LOVING COUNTY · LINK-VJ RANCH 55-2 E LEASE · API 42-301-35959 · DISTRICT 7B
Link-VJ Ranch 55-2 E #2992H
Loving County · Phantom (Wolfcamp) field · Producing · Horizontal
Link-VJ Ranch 55-2 E #2992H (API 42-301-35959) is a horizontal well in Loving County operated by Pdeh LLC, completed May 22, 2023 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued June 29, 2022, permitted to 11,806 ft.
Completion filings report 7 formation tops, including Delaware, Bell Canyon, Cherry Canyon, Brushy Canyon.
Its lease has reported 292K barrels of oil and 2.69M mcf of gas since May 2023, last reporting in July 2026.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 8, 2025
- Permits on file
- 498
- Phone
- (432) 683-7443
SOURCE · RRC EWA WELLBORE SCHEDULE
- 11,806
- total depth, ft
- 1
- permits on file
- Jun 29, 2022
- last permit issued
- May 22, 2023
- completed
- 292K
- cumulative oil, bbl
- 2.69M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2023 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 22, 2023
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Link-VJ Ranch 55-2 E O-10-64026 | Phantom (Wolfcamp) | Pdeh LLC | 1 | 292K | 2.69M | May 2023 – Jul 2026 |
Gas, mcf lease total
Last 12 months 741,640 · prior 12 1,053,464(-30%)
Oil, barrels lease total
Last 12 months 71,069 · prior 12 120,169(-41%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pdeh LLCMay 2023 → Apr 2026
Permits
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 22, 2023 | Link-VJ Ranch 55-2 E O-10-64026 | Phantom (Wolfcamp) | Pdeh LLC | Producing | 11,806 |
Formation tops
As filed on W-2/G-1. Subsea from 2,764 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Delaware | 3,625 | -861 |
| Bell Canyon | 3,656 | -892 |
| Cherry Canyon | 4,632 | -1,868 |
| Brushy Canyon | 6,244 | -3,480 |
| Bone Spring | 7,584 | -4,820 |
| Bone SpringBONE SPRING 1ST | 8,620 | -5,856 |
| Bone SpringBONE SPRING 2ND | 9,384 | -6,620 |
| Bone SpringBONE SPRING 3RD | 10,309 | -7,545 |
| Wolfcamp | 10,657 | -7,893 |
| Red Bluff | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,903 | 22,072 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,215 | 14.75 | 775 S |
| 7.625 | 11,277 | 9.875 | 1,030 S |
| 5.5 | 22,140 | 6.75 | 2,205 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 29, 2025 | Sep 18, 2025 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-301-35959 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-301-35959 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30135959, documented in the API reference.