TEXAS · WELLS · LOVING COUNTY · CBR 12-1C-56-1 LEASE · API 42-301-36572 · DISTRICT 7B

CBR 12-1C-56-1 #332H

Y

Loving County · Sandbar (Bone Spring) field · Producing  · Horizontal

Cbr 12-1c-56-1 #332H (API 42-301-36572) is a horizontal well in Loving County operated by Wpx Energy Permian LLC, completed July 12, 2024 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 12, 2023, permitted to 10,254 ft.

Completion filings report 10 formation tops, including Bell Canyon, Delaware, Cherry Canyon, Brushy Canyon.

No lease production has been reported under this well’s leases.

Operator of record

WPX Energy Permian LLC

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
956
Phone
(405) 235-3611

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWPX Energy Permian LLC
Production reportsWPX Energy Permian, LLCthrough Mar 2026
Latest permitWPX Energy Permian, LLCSep 12, 2023
10,254
total depth, ft
1
permits on file
Sep 12, 2023
last permit issued
Jul 12, 2024
completed
0
cumulative oil, bbl
1.47M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2024 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 12, 2024
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

31.969208, -103.816593

Google Maps ↗

Permit surface location from the RRC GIS record, in Loving County.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
CBR 12-1C-56-1 G-10-297873Sandbar (Bone Spring)WPX Energy Permian, LLC101.47MJan 2024 – Jul 2026

Gas, mcf lease total

Last 12 months 436,868 · prior 12 1,030,091(-58%)

0100K200K300K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1WPX Energy Permian, LLCJul 2024 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
893564-99DrillWPX Energy Permian, LLCSep 8, 2023Sep 12, 2023Nov 29, 202314,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 12, 2024CBR 12-1C-56-1 G-10-297873Sandbar (Bone Spring)WPX Energy Permian LLCProducing10,254

Formation tops

As filed on W-2/G-1. Subsea from 3,021 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon3,648-627
Delaware3,648-627
Cherry Canyon4,800-1,779
Brushy Canyon5,924-2,903
Bone Spring8,591-5,570
Bone Spring2ND BONE SPRING9,186-6,165
Bone Spring3RD BONE SPRING9,643-6,622
AtokaATOKA - HIGH PRESSURE——
Pennsylvanian——
Red Bluff——
Strawn——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
10,40820,765Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,61513.51,240 S
8.6259,5919.875600 S
5.520,8347.8751,780 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 17, 2025Oct 17, 2024—
00Sep 19, 2024Jun 26, 2024Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Nearby wells and their tops

NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM

Draw a cross-section

This well's tops beside its 5 nearest neighbors, subsea-aligned so they line up regardless of surface terrain.

Open the cross-section →

CBR 12-1D-56-142-301-36573

0.0 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon3,651-630
Delaware3,651-630
Cherry Canyon4,794-1,773
Brushy Canyon5,927-2,906
Bone Spring8,581-5,560
Bone Spring9,199-6,178
Strawn—
Wolfcamp—

10 TOPS · FIRST 8

CBR 12-1A-56-142-301-36570

0.0 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon3,647-626
Delaware3,647-626
Cherry Canyon4,789-1,768
Brushy Canyon5,910-2,889
Bone Spring8,572-5,551
Bone Spring9,184-6,163
Strawn—
Atoka—

11 TOPS · FIRST 8

CBR 12-1B-56-142-301-36571

0.0 KM · WPX Energy Permian, LLC · Section with this well →

Delaware3,643-621
Bell Canyon3,643-621
Cherry Canyon4,802-1,780
Brushy Canyon5,915-2,893
Bone Spring8,577-5,555
Bone Spring9,181-6,159
Atoka—
Pennsylvanian—

11 TOPS · FIRST 8

CBR 12-1J-56-142-301-36579

0.3 KM · WPX Energy Permian, LLC · Section with this well →

Delaware3,654-652
Bell Canyon3,654-652
Cherry Canyon4,776-1,774
Brushy Canyon5,916-2,914
Bone Spring8,560-5,558
Bone Spring9,184-6,182
Bone Spring9,612-6,610
Wolfcamp10,792-7,790

12 TOPS · FIRST 8

CBR 12-1K-56-142-301-36580

0.3 KM · WPX Energy Permian, LLC · Section with this well →

Delaware3,663-661
Bell Canyon3,663-661
Cherry Canyon4,805-1,803
Brushy Canyon5,827-2,825
Bone Spring8,559-5,557
Bone Spring9,188-6,186
Bone Spring10,440-7,438
Wolfcamp10,823-7,821

13 TOPS · FIRST 8

CBR 12-1P-56-142-301-36581

0.3 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon3,656-654
Delaware3,656-654
Cherry Canyon4,797-1,795
Brushy Canyon5,916-2,914
Bone Spring8,560-5,558
Bone Spring9,178-6,176
Bone Spring10,424-7,422
Wolfcamp10,808-7,806

10 TOPS · FIRST 8

CBR 12-1Q-56-142-301-36582

0.3 KM · WPX Energy Permian, LLC · Section with this well →

Bell Canyon3,663-661
Delaware3,663-661
Cherry Canyon4,808-1,806
Brushy Canyon5,935-2,933
Bone Spring8,560-5,558
Bone Spring9,192-6,190
Bone Spring10,433-7,431
Wolfcamp10,824-7,822

12 TOPS · FIRST 8

CBR 12-1L-56-142-301-36583

0.5 KM · WPX Energy Permian, LLC · Section with this well →

Delaware3,673-661
Bell Canyon3,673-661
Cherry Canyon4,807-1,795
Brushy Canyon5,959-2,947
Bone Spring8,571-5,559
Bone Spring9,200-6,188
Bone Spring10,431-7,419
Wolfcamp10,834-7,822

11 TOPS · FIRST 8

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30136572, documented in the API reference.