TEXAS · WELLS · LOVING COUNTY · API 42-301-38069 · DISTRICT 08
Paintbrush 27-6-21 #17H
Loving County · Horizontal
- Permitted fields · any of 2
- Phantom (Wolfcamp) · Sandbar (Bone Spring)
- Not one formation; the well must be completed in one of them, and no target formation is stated.
Paintbrush 27-6-21 #17H (API 42-301-38069) is a permitted horizontal well in Loving County filed by Permian Resources Operating, LLC; no completion report is on file yet.
The RRC has issued one drilling permit, issued November 20, 2026, permitted to 13,000 ft.
Permit operator
Permian Resources Operating, LLC
The RRC's wellbore file has no operator of record for it yet; this is the operator on its permit.
SOURCE · LATEST PERMIT (NO EWA RECORD)
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Permian Resources Operating, LLCNov 20, 2026 |
- 13,000
- total depth, ft
- 1
- permits on file
- Nov 20, 2026
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 920209-99 | Drill | Permian Resources Operating, LLC | Nov 17, 2026 | Nov 20, 2026 | — | 13,000 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/30138069, documented in the API reference.