TEXAS · WELLS · LUBBOCK COUNTY · HANCOCK, HARVEY LEASE · API 42-303-31273 · DISTRICT 7B

Hancock Harvey #1A

Plugged

Lubbock County · Hoople (Clear Fork) field  · Vertical

Hancock Harvey #1A (API 42-303-31273) is a plugged well in Lubbock County, plugged April 25, 2018, last operated by Juno Operating Company Iii LLC.

The RRC has issued one drilling permit, issued March 24, 1994, permitted to 4,800 ft.

It was permitted by Hallwood Petroleum, Inc. and has since transferred to Juno Operating Company Iii LLC on the wellbore schedule.

Completion filings report one formation top, including Clear Fork.

Its lease has reported 204K barrels of oil and 28 mcf of gas since January 1993, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.

Operator of record

Juno Operating Company III LLC

Permitted by Hallwood Petroleum, Inc.; the EWA schedule now lists a different operator.

Based in
Plano, TX
P-5 status
Active (A)
P-5 last filed
Mar 19, 2026
Permits on file
111
Phone
(214) 239-3950

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJuno Operating Company III LLC
Production reportsJuno Operating Company III, LLCthrough Apr 2026
Latest permitHallwood Petroleum, Inc.Mar 24, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,800
total depth, ft
1
permits on file
Mar 24, 1994
last permit issued
May 20, 1994
completed
204K
cumulative oil, bbl
28
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 20, 1994
Shut in
—
Plugged
Apr 25, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hancock, Harvey O-11-65513Hoople (Clear Fork)Juno Operating Company III, LLC7204K28Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 5,086 · prior 12 5,567(-9%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hallwood Petroleum, Inc.Jan 1993 → Mar 1996
  2. 2Xeric Oil & Gas CorporationApr 1996 → Jul 1997
  3. 3Stealth Oil Corp.Aug 1997 → May 1998
  4. 4Aoco Operating Company, L.L.C.Jun 1998 → Feb 2005
  5. 5Aoco Operating, L.P.Mar 2005 → Feb 2007
  6. 6Juno Operating Company, LLCMar 2007 → Jul 2011
  7. 7Juno Operating Company II, LLCAug 2011 → May 2016
  8. 8Juno Operating Company III, LLCJun 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
422262-99DrillHallwood Petroleum, Inc.Mar 22, 1994Mar 24, 1994Apr 19, 19944,800

Completions

CompletedLeaseFieldOperatorStatusDepth
May 20, 1994Hancock Harvey O-11-65513Hoople (Clear Fork)Juno Operating Company III LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 3,069 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK4,316-1,247

Perforations

Perforated and open-hole intervals.

FromToType
4,4204,434Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62538412.25250 S
5.54,6007.875800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 23, 1994Jun 9, 1994Yes
00Jun 17, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/30331273, documented in the API reference.