TEXAS · WELLS · MCMULLEN COUNTY · API 42-311-01799 · DISTRICT 04

Campbell M. E. #2

Plugged

McMullen County · Hagist Ranch (Wilcox E) field  · Vertical

Campbell M. E. #2 (API 42-311-01799) is a plugged well in Mcmullen County, plugged September 18, 1983, last operated by Arco Oil & Gas CO..

The RRC has issued 2 drilling permits between 1979 and 1980, permitted to 7,865 ft.

Operator of record

Arco Oil & Gas Co.

Based in
Plano, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 23, 2004
Permits on file
3,065
Phone
(972) 509-7001

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleArco Oil & Gas Co.
Production reportsnone
Latest permitArco Oil & Gas Co.Jul 24, 1980
7,865
total depth, ft
2
permits on file
Jul 24, 1980
last permit issued
Mar 19, 1981
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 19, 1981
Shut in
—
Plugged
Sep 18, 1983

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
87712-99RecompletionArco Oil & Gas Co.Jul 24, 1980Jul 24, 1980—7,865
62526-99RecompletionArco Oil & Gas Co.Oct 31, 1979Oct 31, 1979—7,865

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 19, 1981Campbell M. E. G-4-94765Hagist Ranch (Wilcox E)Arco Oil & Gas Co.Plugged—
Jun 13, 1980Campbell Myrtle E. O-4-1194Hagist Ranch ( Wilcox G)Arco Oil & Gas Co.Plugged—
Apr 26, 1954Campbell Myrtle E. G-4-10711Hagist Ranch ( Wilcox Upper)Arco Oil & Gas Co.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
7,1907,205Perforated
7,5187,535Perforated
7,7007,714Perforated
7,7317,738Perforated
—7,796Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.75995—650 S
2.3757,239——
5.57,856—700 S
10.75——650 S
5.5——700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Aug 19, 1981—
00Jan 12, 1984Jul 21, 1980—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31101799, documented in the API reference.