TEXAS · WELLS · MCMULLEN COUNTY · KYNETTE, P. LEASE · API 42-311-02009 · DISTRICT 01

Kynette P. #8

Plugged

McMullen County · Campana South (1870 Sand) field  · Vertical

Kynette P. #8 (API 42-311-02009) is a plugged well in Mcmullen County, plugged September 19, 2011, last operated by Atlas Operating LLC.

The RRC has issued 2 drilling permits between 1978 and 1985, permitted to 2,574 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Atlas Operating LLC on the wellbore schedule.

Its lease has reported 15.2K barrels of oil and 21 mcf of gas since January 1993, with no volume in the three years through April 2026.

Operator of record

Atlas Operating LLC

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Hearing (H)
P-5 last filed
Mar 9, 2026
Permits on file
78
Phone
(281) 893-9400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAtlas Operating LLC
Production reportsAtlas Operating LLCthrough Sep 1996
Latest permitMobil Producing TX. & N.M. Inc.Dec 27, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,574
total depth, ft
2
permits on file
Dec 27, 1985
last permit issued
Jan 29, 1988
completed
15.2K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 1996

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 29, 1988
Shut in
—
Plugged
Sep 19, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kynette, P. O-1-11997Campana, South (1870 Sand)Atlas Operating LLC115.2K21Jan 1993 – Sep 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phoenix Fund, Inc.Jan 1993 → Aug 1994
  2. 2STZ Petroleum Inc.Sep 1994 → Sep 1996

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
294013-99RecompletionMobil Producing TX. & N.M. Inc.May 12, 1986Dec 27, 1985—2,574
24859-99RecompletionMobil Oil CorporationMay 22, 1978May 22, 1978—2,518

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 29, 1988Kynette P. O-1-11997Campana South (1870 Sand)Atlas Operating LLCPlugged—
Feb 14, 1986Kynette P. G-1-121817Campana South (1870 Sand)Mobil Producing TX. & N.M. Inc.Plugged—
Aug 22, 1978Kynette P. O-1-5771Campana South (Chernosky)Mobil Producing TX. & N.M. Inc.Plugged—
—Kynette P. O-1-187Campana S. (Govt. Wells Sd.)Mobil Oil CorporationPlugged—

Perforations

Perforated and open-hole intervals.

FromToType
1,8421,856Perforated
1,8571,875Perforated
2,3922,402Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7521015140 S
10.75210——
2.8752,458——
6.6252,5719.875165 S
6.6252,571——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 26, 1988Mar 30, 1988—
00Apr 19, 1988——
00Aug 25, 1986Apr 8, 1986Yes
00Aug 14, 1986——
00Jan 12, 1984Sep 7, 1978—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31102009, documented in the API reference.