TEXAS · WELLS · MCMULLEN COUNTY · API 42-311-32445 · DISTRICT 01
Hostetter #2
McMullen County · Hostetter (Wilcox 11900) field · Vertical
Hostetter #2 (API 42-311-32445) is a plugged well in Mcmullen County, plugged February 16, 2012, last operated by Chevron U. S. A. Inc..
The RRC has issued 2 drilling permits between 1986 and 2010, permitted to 13,000 ft.
Completion filings report one formation top, including N/A.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 30, 2026
- Permits on file
- 9,293
- Phone
- (866) 212-1212
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Chevron U. S. A. Inc. |
| Production reports | Chevron U. S. A. Inc.through Aug 2011 |
| Latest permit | Chevron U. S. A. Inc.Sep 9, 2010 |
- 13,000
- total depth, ft
- 2
- permits on file
- Sep 9, 2010
- last permit issued
- Jan 8, 2011
- completed
- 0
- cumulative oil, bbl
- 2.92M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 8, 2011
- Shut in
- —
- Plugged
- Feb 16, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hostetter G-1-121753 | Hostetter (FB-A) | Williams, Clayton Energy, Inc. | 1 | 0 | 2.9M | Jan 1993 – Feb 2012 |
| Hostetter G-1-266467 | Hostetter (Wilcox 11900) | Chevron U. S. A. Inc. | 1 | 0 | 18K | Jan 2011 – Feb 2012 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Jan 1993 → May 2002
- 2Chevron U. S. A. Inc.Jun 2002 → Aug 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 701536-99 | Recompletion | Chevron U. S. A. Inc. | Aug 31, 2010 | Sep 9, 2010 | Dec 2, 2010 | 12,550 |
| 297280-99 | Drill | Tana Oil & Gas Corp. | Jun 6, 1986 | Feb 7, 1986 | Mar 12, 1986 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 8, 2011 | Hostetter G-1-266467 | Hostetter (Wilcox 11900) | Chevron U. S. A. Inc. | Plugged | — |
| Aug 12, 1986 | Hostetter G-1-121753 | Hostetter (FB-A) | Williams Clayton Energy Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 457 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| N/A | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,704 | 11,722 | Perforated |
| 12,358 | 12,457 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 2,993 | 17.5 | 1,980 S |
| 9.625 | 8,433 | 12.25 | 840 S |
| 7.625 | 11,113 | 8.5 | 395 S |
| 5 | 12,549 | 6.5 | 235 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 20, 2013 | Apr 13, 2011 | Yes |
| 00 | Oct 2, 1986 | Sep 11, 1986 | Yes |
| 00 | Sep 4, 1986 | May 3, 1986 | Yes |
| 00 | Aug 5, 1986 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-32445 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-32445 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31132445, documented in the API reference.