WELL · 42-311-33798 · DISTRICT 1

Peeler C #C 6

Plugged

McMullen County · Sophia (Wilcox Consol.) field  · Vertical

Peeler C #C 6 (API 42-311-33798) is a plugged well in Mcmullen County, plugged February 12, 2008, last operated by Hawthorn Energy Partners LLC.

The RRC has issued one drilling permit, issued March 31, 2005, permitted to 5,600 ft.

Completion filings report one formation top, including Wilcox.

Its lease has reported 221K barrels of oil and 9.9K mcf of gas since September 2004, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

Hawthorn Energy Partners LLC

Based in
Nichols Hill, OK
P-5 status
Active (A)
P-5 last filed
Dec 22, 2025
Permits on file
79
Phone
(405) 755-5900

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHawthorn Energy Partners LLC
Production reportsHawthorn Energy Partners, LLCthrough Apr 2026
Latest permitHawthorn Energy Partners, LLCMar 31, 2005
5,600
total depth, ft
1
permits on file
Mar 31, 2005
last permit issued
Jun 17, 2005
completed
221K
cumulative oil, bbl
9.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 17, 2005
Shut in
—
Plugged
Feb 12, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Peeler C O-1-14540Sophia (Wilcox Consol.)Hawthorn Energy Partners, LLC6221K9.9KSep 2004 – Jul 2026

Oil, barrels lease total

Last 12 months 2,788 · prior 12 3,177(-12%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hawthorn Energy Partners, LLCSep 2004 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
559780-99DrillHawthorn Energy Partners, LLCMar 31, 2005Mar 31, 2005Jun 5, 20055,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-14540————

Formation tops

As filed on W-2/G-1. Subsea from 355 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox5,353-4,998

Perforations

Perforated and open-hole intervals.

FromToType
5,3535,370Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62565712.25310 S
4.55,5947.875245 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 17, 2005Aug 24, 2005Yes
00Sep 9, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31133798, documented in the API reference.