TEXAS · WELLS · MCMULLEN COUNTY · API 42-311-34196 · DISTRICT 01

Layton A #3H

Y

McMullen County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Layton A #3H (API 42-311-34196) is a horizontal well in Mcmullen County operated by Xto Energy Inc., completed October 1, 2010 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits (amended once) between 2010 and 2016, permitted to 11,935 ft.

Completion filings report 3 formation tops, including Midway, Olmos, Eagle Ford.

Its 2 leases have reported 7.97K barrels of oil and 194K mcf of gas since November 2010, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.Feb 5, 2016
11,935
total depth, ft
3
permits on file
Feb 5, 2016
last permit issued
Oct 1, 2010
completed
7.97K
cumulative oil, bbl
194K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 1, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Layton A O-1-18751Eagleville (Eagle Ford-1)XTO Energy Inc.17.97K40.6KApr 2014 – Jul 2026
Layton "A" G-1-260178Hawkville (Eagleford Shale)XTO Energy Inc.10153KNov 2010 – Dec 2015

Oil, barrels lease total

Last 12 months 467 · prior 12 405(+15%)

050100202420252026

Gas, mcf lease total

Last 12 months 39 · prior 12 75(-48%)

01020202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Nov 2010 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
813565-99Field transferXTO Energy Inc.Jan 29, 2016Feb 5, 2016Aug 22, 201012,000
690641-98DrillXTO Energy Inc.Nov 11, 2010Feb 8, 2010Aug 23, 201016,500
690641-99DrillXTO Energy Inc.Feb 2, 2010Feb 8, 2010Aug 23, 201016,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 1, 2010Layton A O-1-18751Eagleville (Eagle Ford-1)XTO Energy Inc.Producing11,935
Nov 11, 2010Layton A G-1-260178Hawkville (Eagleford Shale)XTO Energy Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 290 ft elevation.Download CSV →

FormationMD ftSubsea
Midway7,765-7,475
Olmos10,080-9,790
Eagle Ford12,115-11,825
Eagle FordEAGLEFORD12,115-11,825

Perforations

Perforated and open-hole intervals.

FromToType
12,45012,700Perforated
12,45015,950Perforated
12,75013,000Perforated
13,85014,100Perforated
14,15014,400Perforated
14,45014,700Perforated
14,75015,000Perforated
15,05015,300Perforated
15,35015,600Perforated
15,70015,950Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37550017.5515 S
9.6255,62012.251,830 S
5.516,0458.51,425 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 5, 2016Mar 30, 2016—
00Jul 12, 2011Jan 14, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31134196, documented in the API reference.