TEXAS · WELLS · MCMULLEN COUNTY · API 42-311-34247 · DISTRICT 01

Haynes #1H

Y

McMullen County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Haynes #1H (API 42-311-34247) is a horizontal well in Mcmullen County operated by Gulftex Energy LLC, completed October 11, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 13, 2010, permitted to 10,347 ft.

It was permitted by Eog Resources, Inc. and has since transferred to Gulftex Energy LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Midway, Navarro, Olmos, Anacacho.

Its 2 leases have reported 619K barrels of oil and 662K mcf of gas since October 2010, last reporting in July 2026. The leases carry 7 wells, so these are lease totals, not this well alone.

Operator of record

Gulftex Energy LLC

Permitted by EOG Resources, Inc.; the EWA schedule now lists a different operator.

Based in
San Antonio, TX
P-5 status
Active (A)
P-5 last filed
Jul 14, 2026
Permits on file
181
Phone
(210) 402-9600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsGulftex Energy, LLCthrough Mar 2026
Latest permitEOG Resources, Inc.Jul 13, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,347
total depth, ft
1
permits on file
Jul 13, 2010
last permit issued
Oct 11, 2010
completed
619K
cumulative oil, bbl
662K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 11, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Haynes O-1-15269Eagleville (Eagle Ford-1)Gulftex Energy, LLC4589K659KDec 2010 – Jul 2026
Haynes O-2-9517Eagleville (Eagle Ford)EOG Resources, Inc.330.3K3.15KOct 2010 – Dec 2011

Oil, barrels lease total

Last 12 months 45,005 · prior 12 11,324(+297%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 20,294 · prior 12 11,796(+72%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.Oct 2010 → Jun 2023
  2. 2Gulftex Energy, LLCJul 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
698703-99DrillEOG Resources, Inc.Jul 8, 2010Jul 13, 2010Aug 21, 201012,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 11, 2010Haynes O-1-15269Eagleville (Eagle Ford-1)Gulftex Energy LLCProducing10,347
Oct 11, 2010Haynes O-2-9517Eagleville (Eagle Ford)EOG Resources Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 361 ft elevation.Download CSV →

FormationMD ftSubsea
Midway5,963-5,602
Navarro6,821-6,460
Olmos7,980-7,619
Anacacho9,328-8,967
Eagle Ford9,999-9,638

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,63812.252,062 S
5.514,6318.752,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 26, 2011Oct 25, 2010Yes
00Apr 21, 2011Oct 25, 2010Yes
00Apr 13, 2011——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31134247, documented in the API reference.