WELL · 42-311-34272 · DISTRICT 1
Aery Gas Unit 1 #1
McMullen County · Hawkville (Eagleford Shale) field · Horizontal
Aery Gas Unit 1 #1 (API 42-311-34272) is a horizontal well in Mcmullen County operated by Talisman Energy USA Inc., completed December 27, 2010.
The RRC has issued 2 drilling permits (amended once) between 2010 and 2011, permitted to 14,000 ft.
Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.
Its 2 leases have reported 805K barrels of oil and 1.64M mcf of gas since December 2010, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- The Woodlands, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Feb 23, 2018
- Permits on file
- 552
- Phone
- (832) 442-1000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Talisman Energy USA Inc. |
| Production reports | Repsol Oil & Gas USA, LLCthrough Apr 2026 |
| Latest permit | Talisman Energy USA Inc.Oct 18, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,000
- total depth, ft
- 3
- permits on file
- Oct 18, 2011
- last permit issued
- Dec 27, 2010
- completed
- 805K
- cumulative oil, bbl
- 1.64M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 27, 2010
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Aery O-1-15836 | Eagleville (Eagle Ford-1) | Repsol Oil & Gas USA, LLC | 4 | 805K | 1.64M | Jun 2011 – Jul 2026 |
| Aery Gas Unit 1 G-1-260183 | Hawkville (Eagleford Shale) | Talisman Energy USA Inc. | 1 | 0 | 0 | Dec 2010 – Jun 2011 |
Oil, barrels lease total
Last 12 months 26,538 · prior 12 26,971(-2%)
Gas, mcf lease total
Last 12 months 72,553 · prior 12 64,084(+13%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Talisman Energy USA Inc.Jun 2011 → Mar 2016
- 2Statoil Texas Onshore Prop LLCApr 2016 → Apr 2018
- 3Equinor Texas Onshore Prop LLCMay 2018 → Nov 2019
- 4Repsol Oil & Gas USA, LLCDec 2019 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 725464-99 | Recompletion | Talisman Energy USA Inc. | Sep 30, 2011 | Oct 18, 2011 | Nov 15, 2010 | 14,000 |
| 700475-98 | Drill | Talisman Energy USA Inc. | Jan 11, 2011 | Aug 11, 2010 | Nov 14, 2010 | 14,000 |
| 700475-99 | Drill | Enduring Resources, LLC | Aug 10, 2010 | Aug 11, 2010 | Nov 15, 2010 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-260183 | — | — | — | — |
| — | — O-1-15836 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 240 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 10,598 | -10,358 |
| Anacacho | 10,600 | -10,360 |
| Austin Chalk | 10,727 | -10,487 |
| Austin Chalk | 10,728 | -10,488 |
| Eagle Ford | 10,856 | -10,616 |
| Eagle Ford | 10,878 | -10,638 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,190 | 17,864 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 5,250 | 14.25 | 3,135 S |
| 5.5 | 9,862 | 9.875 | — |
| 4.5 | 18,025 | 8.75 | 2,665 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 4, 2012 | Oct 6, 2011 | Yes |
| 00 | Jul 12, 2011 | Jan 24, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-34272 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-34272 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31134272, documented in the API reference.