TEXAS · WELLS · MCMULLEN COUNTY · GENTRY LEASE · API 42-311-34898 · DISTRICT 01
Gentry #18H
McMullen County · Hawkville (Eagleford Shale) field · Horizontal
Gentry #18H (API 42-311-34898) is a plugged horizontal well in Mcmullen County, plugged July 2, 2025, last operated by Bpx Operating Company.
The RRC has issued one drilling permit, issued May 1, 2012, permitted to 14,000 ft.
It was permitted by Petrohawk Operating Company and has since transferred to Bpx Operating Company on the wellbore schedule.
Completion filings report 3 formation tops, including Anacacho, Olmos, Eagle Ford.
Operator of record
Permitted by Petrohawk Operating Company; the EWA schedule now lists a different operator.
- Based in
- Denver, CO
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jun 24, 2026
- Permits on file
- 1,576
- Phone
- (720) 439-5104
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BPX Operating Company |
| Production reports | BPX Operating Companythrough Jul 2024 |
| Latest permit | Petrohawk Operating CompanyMay 1, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,000
- total depth, ft
- 1
- permits on file
- May 1, 2012
- last permit issued
- Oct 12, 2012
- completed
- 0
- cumulative oil, bbl
- 1.85M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2012 THROUGH Jun 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 12, 2012
- Shut in
- —
- Plugged
- Jul 2, 2025
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gentry G-1-268152 | Hawkville (Eagleford Shale) | BPX Operating Company | 1 | 0 | 1.85M | Jul 2012 – Jun 2026 |
Gas, mcf lease total
Last 12 months 0 · prior 12 2,984(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Petrohawk Operating CompanyOct 2012 → Jun 2013
- 2BHP Billiton Pet(txla OP) CoAug 2013 → Jul 2019
- 3BPX Operating CompanyAug 2019 → Jul 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 738503-99 | Drill | Petrohawk Operating Company | Apr 18, 2012 | May 1, 2012 | Aug 24, 2012 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 12, 2012 | Gentry G-1-268152 | Hawkville (Eagleford Shale) | BPX Operating Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 242 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 2,799 | -2,557 |
| Olmos | 10,970 | -10,728 |
| Anacacho | 12,799 | -12,557 |
| Eagle FordEAGLEFORD SHALE | 13,194 | -12,952 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 13,546 | 18,597 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 5,760 | 12.25 | 1,735 S |
| 5.5 | 10,409 | 6.75 | 1,115 S |
| 4.5 | 18,653 | 6.75 | 1,115 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 26, 2013 | Jun 10, 2013 | Yes |
| 00 | Jun 11, 2013 | Sep 20, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-34898 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-34898 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31134898, documented in the API reference.