WELL · 42-311-34904 · DISTRICT 1

Teal MCM #A 3H

Y

McMullen County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Teal Mcm #A 3H (API 42-311-34904) is a horizontal well in Mcmullen County operated by Ineos USA Oil & Gas LLC, completed February 1, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued May 7, 2012, permitted to 11,428 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Ineos USA Oil & Gas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 489K barrels of oil and 953K mcf of gas since August 2012, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Ineos USA Oil & Gas LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active – Extension (X)
P-5 last filed
May 26, 2026
Permits on file
98
Phone
(720) 764-3473

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsIneos USA Oil & Gas LLCthrough Apr 2026
Latest permitChesapeake Operating, Inc.May 7, 2012
11,428
total depth, ft
1
permits on file
May 7, 2012
last permit issued
Feb 1, 2013
completed
489K
cumulative oil, bbl
953K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 1, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Teal MCM O-1-16557Eagleville (Eagle Ford-1)Ineos USA Oil & Gas LLC2489K953KAug 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 10,336 · prior 12 13,002(-21%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 37,879 · prior 12 43,534(-13%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Mar 2013 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Mar 2023
  3. 3Ineos USA Oil & Gas LLCApr 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
738801-99DrillChesapeake Operating, Inc.Apr 23, 2012May 7, 2012Jun 22, 201212,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 1, 2013Teal MCM O-1-16557Eagleville (Eagle Ford-1)Ineos USA Oil & Gas LLCProducing11,428

Formation tops

As filed on W-2/G-1. Subsea from 254 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho10,609-10,355
Austin Chalk10,963-10,709
Eagle Ford11,024-10,770
Eagle FordEAGLEFORD11,024-10,770

Perforations

Perforated and open-hole intervals.

FromToType
11,54918,700Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,18212.251,510 S
5.518,8138.752,285 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 5, 2013Apr 9, 2013—
00Apr 29, 2013Feb 26, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31134904, documented in the API reference.