TEXAS · WELLS · MCMULLEN COUNTY · LOTTIE UNIT LEASE · API 42-311-35020 · DISTRICT 01

Lottie Unit #5H

Y

McMullen County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Lottie Unit #5H (API 42-311-35020) is a horizontal well in Mcmullen County operated by Gulftex Energy LLC, completed April 9, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 3, 2012, permitted to 10,123 ft.

It was permitted by Eog Resources, Inc. and has since transferred to Gulftex Energy LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 1.35M barrels of oil and 1.26M mcf of gas since April 2013, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.

Operator of record

Gulftex Energy LLC

Permitted by EOG Resources, Inc.; the EWA schedule now lists a different operator.

Based in
San Antonio, TX
P-5 status
Active (A)
P-5 last filed
Jul 14, 2026
Permits on file
181
Phone
(210) 402-9600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGulftex Energy LLC
Production reportsGulftex Energy, LLCthrough Mar 2026
Latest permitEOG Resources, Inc.Jul 3, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,123
total depth, ft
1
permits on file
Jul 3, 2012
last permit issued
Apr 9, 2013
completed
1.35M
cumulative oil, bbl
1.26M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 9, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lottie Unit O-1-16821Eagleville (Eagle Ford-1)Gulftex Energy, LLC51.35M1.26MApr 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 39,206 · prior 12 28,206(+39%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 20,946 · prior 12 16,299(+29%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.May 2013 → Jun 2023
  2. 2Gulftex Energy, LLCJul 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
742747-99DrillEOG Resources, Inc.Jun 13, 2012Jul 3, 2012Sep 17, 201210,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 9, 2013Lottie Unit O-1-16821Eagleville (Eagle Ford-1)Gulftex Energy LLCProducing10,123

Formation tops

As filed on W-2/G-1. Subsea from 362 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho9,768-9,406
Austin Chalk10,082-9,720
Eagle Ford10,152-9,790

Perforations

Perforated and open-hole intervals.

FromToType
10,45716,709Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,02812.251,525 S
5.516,8068.51,830 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 16, 2013May 24, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31135020, documented in the API reference.