WELL · 42-311-35048 · DISTRICT 1

Bracken #J 4H

Y

McMullen County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Bracken #J 4H (API 42-311-35048) is a horizontal well in Mcmullen County operated by Repsol Oil & Gas USA LLC, completed July 20, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued July 26, 2012, permitted to 11,360 ft.

It was permitted by Talisman Energy USA Inc. and has since transferred to Repsol Oil & Gas USA LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 1.01M barrels of oil and 3.12M mcf of gas since June 2011, last reporting in July 2026. The lease carries 13 wells, so these are lease totals, not this well alone.

Operator of record

Repsol Oil & Gas USA LLC

Permitted by Talisman Energy USA Inc.; the EWA schedule now lists a different operator.

Based in
The Woodlands, TX
P-5 status
Active (A)
P-5 last filed
Apr 22, 2026
Permits on file
189
Phone
(832) 442-1000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRepsol Oil & Gas USA LLC
Production reportsRepsol Oil & Gas USA, LLCthrough Apr 2026
Latest permitTalisman Energy USA Inc.Jul 26, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,360
total depth, ft
1
permits on file
Jul 26, 2012
last permit issued
Jul 20, 2013
completed
1.01M
cumulative oil, bbl
3.12M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 20, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 13 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bracken O-1-15838Eagleville (Eagle Ford-1)Repsol Oil & Gas USA, LLC131.01M3.12MJun 2011 – Jul 2026

Oil, barrels lease total

Last 12 months 29,708 · prior 12 29,448(+1%)

05K10K202420252026

Gas, mcf lease total

Last 12 months 142,459 · prior 12 238,019(-40%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Talisman Energy USA Inc.Jun 2011 → Mar 2016
  2. 2Statoil Texas Onshore Prop LLCApr 2016 → Apr 2018
  3. 3Equinor Texas Onshore Prop LLCMay 2018 → Nov 2019
  4. 4Repsol Oil & Gas USA, LLCDec 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
744784-99DrillTalisman Energy USA Inc.Jul 17, 2012Jul 26, 2012Jun 23, 201312,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-15838————

Formation tops

As filed on W-2/G-1. Subsea from 400 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho10,917-10,517
Austin Chalk11,334-10,934
Eagle Ford11,406-11,006

Perforations

Perforated and open-hole intervals.

FromToType
12,50216,483Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37533517.5400 S
9.6256,38912.251,450 S
5.510,7228.51,099 S
516,7538.51,016 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 8, 2013Aug 16, 2013—
00May 23, 2013Mar 28, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31135048, documented in the API reference.