TEXAS · WELLS · MCMULLEN COUNTY · TYLER LEASE · API 42-311-35347 · DISTRICT 01
Tyler #10H
McMullen County · Eagleville (Eagle Ford-1) field · Producing · Horizontal
Tyler #10H (API 42-311-35347) is a horizontal well in Mcmullen County operated by Murphy Expl. & Prod. CO. - USA, completed April 7, 2014 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued March 28, 2013, permitted to 10,855 ft.
Completion filings report 4 formation tops, including Olmos, Chalk, Undiff Chalk, Eagle Ford.
Its lease has reported 3.15M barrels of oil and 4.27M mcf of gas since February 2011, last reporting in July 2026. The lease carries 14 wells, so these are lease totals, not this well alone.
Operator of record
Murphy Expl. & Prod. Co. - USA
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- May 15, 2026
- Permits on file
- 1,458
- Phone
- (281) 675-9000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Murphy Expl. & Prod. Co. - USA |
| Production reports | Murphy Expl. & Prod. Co. - USAthrough Apr 2026 |
| Latest permit | Murphy Expl. & Prod. Co. - USAMar 28, 2013 |
- 10,855
- total depth, ft
- 1
- permits on file
- Mar 28, 2013
- last permit issued
- Apr 7, 2014
- completed
- 3.15M
- cumulative oil, bbl
- 4.27M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 7, 2014
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 14 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Tyler O-1-15506 | Eagleville (Eagle Ford-1) | Murphy Expl. & Prod. Co. - USA | 14 | 3.15M | 4.27M | Feb 2011 – Jul 2026 |
Oil, barrels lease total
Last 12 months 50,280 · prior 12 64,080(-22%)
Gas, mcf lease total
Last 12 months 85,892 · prior 12 100,666(-15%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Murphy Expl. & Prod. Co. - USAAug 2011 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 759460-99 | Drill | Murphy Expl. & Prod. Co. - USA | Mar 26, 2013 | Mar 28, 2013 | Mar 18, 2014 | 10,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 7, 2014 | Tyler O-1-15506 | Eagleville (Eagle Ford-1) | Murphy Expl. & Prod. Co. - USA | Producing | 10,855 |
Formation tops
As filed on W-2/G-1. Subsea from 304 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Olmos | 8,531 | -8,227 |
| Chalk | 9,936 | -9,632 |
| Undiff Chalk | 9,936 | -9,632 |
| Eagle FordEAGLEFORD | 10,555 | -10,251 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,925 | 16,457 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 4,406 | 12.25 | 1,080 S |
| 5.5 | 16,564 | 7.875 | 1,790 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 17, 2014 | May 28, 2014 | Yes |
| 00 | Jan 7, 2014 | Nov 1, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-35347 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-35347 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31135347, documented in the API reference.