TEXAS · WELLS · MCMULLEN COUNTY · RANCHO TRES HIJOS LEASE · API 42-311-35491 · DISTRICT 01
Rancho Tres Hijos #3H
McMullen County · Eagleville (Eagle Ford-1) field · Shut In · Horizontal
Rancho Tres Hijos #3H (API 42-311-35491) is a horizontal well in Mcmullen County operated by Trinity Operating (Usg) LLC, completed February 18, 2014 and listed as shut in on the RRC schedule, shut in December 1, 2021.
The RRC has issued one drilling permit (amended once), issued June 17, 2013, permitted to 10,789 ft.
It was permitted by Comstock Oil & Gas, LP and has since transferred to Trinity Operating (Usg) LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Wilcox, Navarro, Olmos, Anacacho.
Its lease has reported 379K barrels of oil and 995K mcf of gas since December 2010, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Comstock Oil & Gas, LP; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 28, 2026
- Permits on file
- 392
- Phone
- (713) 951-5309
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Trinity Operating (Usg) LLC |
| Production reports | Trinity Operating (Usg), LLCthrough Jul 2025 |
| Latest permit | Comstock Oil & Gas, LPJun 17, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,789
- total depth, ft
- 2
- permits on file
- Jun 17, 2013
- last permit issued
- Feb 18, 2014
- completed
- 379K
- cumulative oil, bbl
- 995K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2010 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 18, 2014
- Shut in
- Dec 1, 2021
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rancho Tres Hijos O-1-15386 | Eagleville (Eagle Ford-1) | Trinity Operating (Usg), LLC | 6 | 379K | 995K | Dec 2010 – Jul 2026 |
Oil, barrels lease total
Last 12 months 1 · prior 12 329(-100%)
Gas, mcf lease total
Last 12 months 0 · prior 12 744(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Comstock Oil & Gas, LPDec 2010 → Aug 2018
- 2Trinity Operating (Usg), LLCSep 2018 → Jul 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 764168-98 | Drill | Comstock Oil & Gas, LP | Feb 28, 2014 | Jun 17, 2013 | Dec 2, 2013 | 13,000 |
| 764168-99 | Drill | Comstock Oil & Gas, LP | Jun 6, 2013 | Jun 17, 2013 | Oct 9, 2013 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 18, 2014 | Rancho Tres Hijos O-1-15386 | Eagleville (Eagle Ford-1) | Trinity Operating (Usg) LLC | Shut In · shut in Dec 1, 2021 | 10,789 |
Formation tops
As filed on W-2/G-1. Subsea from 322 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wilcox | 3,579 | -3,257 |
| Navarro | 7,303 | -6,981 |
| Olmos | 8,341 | -8,019 |
| Anacacho | 10,172 | -9,850 |
| Austin Chalk | 10,631 | -10,309 |
| Eagle Ford | 10,743 | -10,421 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,196 | 15,957 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 5,033 | 14.75 | 2,178 S |
| 5.5 | 10,293 | 8.75 | 1,698 S |
| 5 | 16,019 | 8.75 | 1,314 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 30, 2014 | Mar 28, 2014 | — |
| 00 | Mar 3, 2014 | Jan 24, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-35491 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-35491 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31135491, documented in the API reference.