WELL · 42-311-35593 · DISTRICT 1

Quintanilla MCM #G 2H

Shut in

McMullen County · Eagleville (Eagle Ford-1) field · Shut IN  · Horizontal

Quintanilla Mcm #G 2H (API 42-311-35593) is a horizontal well in Mcmullen County operated by Ineos USA Oil & Gas LLC, completed July 6, 2014 and listed as shut in on the RRC schedule, shut in June 1, 2021.

The RRC has issued one drilling permit, issued July 31, 2013, permitted to 10,991 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Ineos USA Oil & Gas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Anachaco, Austin Chalk, Eagle Ford.

Its lease has reported 1.26M barrels of oil and 2M mcf of gas since November 2012, last reporting in July 2026. The lease carries 12 wells, so these are lease totals, not this well alone.

Operator of record

Ineos USA Oil & Gas LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active – Extension (X)
P-5 last filed
May 26, 2026
Permits on file
98
Phone
(720) 764-3473

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleIneos USA Oil & Gas LLC
Production reportsIneos USA Oil & Gas LLCthrough Apr 2026
Latest permitChesapeake Operating, Inc.Jul 31, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,991
total depth, ft
1
permits on file
Jul 31, 2013
last permit issued
Jul 6, 2014
completed
1.26M
cumulative oil, bbl
2M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 6, 2014
Shut in
Jun 1, 2021
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 12 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Quintanilla MCM O-1-16600Eagleville (Eagle Ford-1)Ineos USA Oil & Gas LLC121.26M2MNov 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 15,234 · prior 12 17,960(-15%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 33,232 · prior 12 27,081(+23%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Apr 2013 → Oct 2014
  2. 2Chesapeake Operating, L.L.C.Nov 2014 → Mar 2023
  3. 3Ineos USA Oil & Gas LLCApr 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
767350-99DrillChesapeake Operating, Inc.Jul 30, 2013Jul 31, 2013Dec 2, 201312,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 6, 2014Quintanilla MCM O-1-16600Eagleville (Eagle Ford-1)Ineos USA Oil & Gas LLCShut IN · shut in Jun 1, 202110,991

Formation tops

As filed on W-2/G-1. Subsea from 252 ft elevation.Download CSV →

FormationMD ftSubsea
Anachaco10,673-10,421
Austin Chalk10,995-10,743
Eagle Ford11,039-10,787

Perforations

Perforated and open-hole intervals.

FromToType
11,27715,121Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,19012.25850 S
5.515,3007.8751,785 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 10, 2014Aug 12, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31135593, documented in the API reference.