TEXAS · WELLS · MCMULLEN COUNTY · BLAHA-DILWORTH (SA) LEASE · API 42-311-35783 · DISTRICT 01

Blaha-Dilworth (SA) #A 1H

Y

McMullen County · Eagleville (Eagle Ford-1) field · Producing  · Horizontal

Blaha-Dilworth (SA) #A 1H (API 42-311-35783) is a horizontal well in Mcmullen County operated by Repsol Oil & Gas USA LLC, completed April 30, 2014 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 27, 2013, permitted to 11,445 ft.

It was permitted by Talisman Energy USA Inc. and has since transferred to Repsol Oil & Gas USA LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Buda, Catahoula, Edwards, Escondido.

Its lease has reported 158K barrels of oil and 388K mcf of gas since April 2014, last reporting in July 2026.

Operator of record

Repsol Oil & Gas USA LLC

Permitted by Talisman Energy USA Inc.; the EWA schedule now lists a different operator.

Based in
The Woodlands, TX
P-5 status
Active (A)
P-5 last filed
Apr 22, 2026
Permits on file
189
Phone
(832) 442-1000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRepsol Oil & Gas USA LLC
Production reportsRepsol Oil & Gas USA, LLCthrough Apr 2026
Latest permitTalisman Energy USA Inc.Dec 27, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,445
total depth, ft
1
permits on file
Dec 27, 2013
last permit issued
Apr 30, 2014
completed
158K
cumulative oil, bbl
388K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 30, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Blaha-Dilworth (SA) O-1-17960Eagleville (Eagle Ford-1)Repsol Oil & Gas USA, LLC1158K388KApr 2014 – Jul 2026

Oil, barrels lease total

Last 12 months 10,817 · prior 12 2,055(+426%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 19,499 · prior 12 13,191(+48%)

02K4K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Talisman Energy USA Inc.Apr 2014 → Mar 2016
  2. 2Statoil Texas Onshore Prop LLCApr 2016 → Apr 2018
  3. 3Equinor Texas Onshore Prop LLCMay 2018 → Nov 2019
  4. 4Repsol Oil & Gas USA, LLCDec 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
775349-99DrillTalisman Energy USA Inc.Dec 10, 2013Dec 27, 2013Apr 5, 201412,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 30, 2014Blaha-Dilworth (SA) O-1-17960Eagleville (Eagle Ford-1)Repsol Oil & Gas USA LLCProducing11,445

Formation tops

As filed on W-2/G-1. Subsea from 344 ft elevation.Download CSV →

FormationMD ftSubsea
BudaBUDA - H2S——
CatahoulaCATAHOULA - DISPOSAL——
EdwardsEDWARDS - H2S——
Escondido——
FrioFRIO - DISPOSAL——
Georgetown——
Navarro——
Olmos——
Pearsall——
YeguaYEGUA - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
11,78319,449Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37563417.5587 S
9.6257,16212.25903 S
5.519,7208.52,571 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 12, 2014Jun 20, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31135783, documented in the API reference.