TEXAS · WELLS · MCMULLEN COUNTY · POWERS LEASE · API 42-311-35836 · DISTRICT 01
Powers #E 8H
McMullen County · Eagleville (Eagle Ford-1) field · Producing · Horizontal
Powers #E 8H (API 42-311-35836) is a horizontal well in Mcmullen County operated by Repsol Oil & Gas USA LLC, completed August 3, 2015 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued January 28, 2014, permitted to 11,240 ft.
It was permitted by Talisman Energy USA Inc. and has since transferred to Repsol Oil & Gas USA LLC on the wellbore schedule.
Completion filings report 10 formation tops, including Wilcox, Olmos, Anacacho, Austin Chalk.
Its lease has reported 3.71M barrels of oil and 7.6M mcf of gas since February 2012, last reporting volume in April 2026. The lease carries 29 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Talisman Energy USA Inc.; the EWA schedule now lists a different operator.
- Based in
- The Woodlands, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 22, 2026
- Permits on file
- 189
- Phone
- (832) 442-1000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Repsol Oil & Gas USA LLC |
| Production reports | Repsol Oil & Gas USA, LLCthrough Apr 2026 |
| Latest permit | Talisman Energy USA Inc.Jan 28, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,240
- total depth, ft
- 1
- permits on file
- Jan 28, 2014
- last permit issued
- Aug 3, 2015
- completed
- 3.71M
- cumulative oil, bbl
- 7.6M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2012 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Aug 3, 2015
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 29 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Powers O-1-15776 | Eagleville (Eagle Ford-1) | Repsol Oil & Gas USA, LLC | 29 | 3.71M | 7.6M | Feb 2012 – Apr 2026 |
Oil, barrels lease total
Last 12 months 74,162 · prior 12 43,951(+69%)
Gas, mcf lease total
Last 12 months 431,856 · prior 12 298,653(+45%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Talisman Energy USA Inc.Feb 2012 → Mar 2016
- 2Statoil Texas Onshore Prop LLCApr 2016 → Apr 2018
- 3Equinor Texas Onshore Prop LLCMay 2018 → Nov 2019
- 4Repsol Oil & Gas USA, LLCDec 2019 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 776863-99 | Drill | Talisman Energy USA Inc. | Jan 8, 2014 | Jan 28, 2014 | Mar 6, 2015 | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 3, 2015 | Powers O-1-15776 | Eagleville (Eagle Ford-1) | Repsol Oil & Gas USA LLC | Producing | 11,240 |
Formation tops
As filed on W-2/G-1. Subsea from 328 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| WilcoxWILCOX - DISPOSAL | 3,898 | -3,570 |
| Olmos | 8,820 | -8,492 |
| Anacacho | 10,399 | -10,071 |
| Austin Chalk | 10,838 | -10,510 |
| Eagle FordEAGLE FORD - H2S | 10,963 | -10,635 |
| CatahoulaCATAHOULA - DISPOSAL | — | — |
| Escondido | — | — |
| FrioFRIO - DISPOSAL | — | — |
| Navarro | — | — |
| YeguaYEGUA - DISPOSAL | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,621 | 18,852 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,222 | 17.5 | 1,400 S |
| 9.625 | 7,030 | 12.25 | 1,571 S |
| 5.5 | 18,982 | 8.5 | 1,069 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 29, 2015 | Sep 3, 2015 | Yes |
| 00 | Sep 8, 2015 | Apr 29, 2015 | Yes |
Well logs
1 log loaded from the RRC's log index, 1 of it with a digital LAS file, the latest received Feb 21, 2018. Gamma ray. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| Gamma RaySpans Wilcox, Olmos, Anacacho, Austin Chalk, Eagle Ford | LAS + TIFF | 7,012 to 18,964 | Feb 21, 2018 | 1.63 + 5.70 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-35836 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-35836 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.