WELL · 42-311-36094 · DISTRICT 1

Gran Torino A #17H

Shut in

McMullen County · Eagleville (Eagle Ford-1) field · Temp Abandoned  · Horizontal

Gran Torino A #17H (API 42-311-36094) is a horizontal well in Mcmullen County operated by Javelin Energy Partners Mgmt LLC, completed September 12, 2014 and listed as temp abandoned on the RRC schedule, shut in August 1, 2025.

The RRC has issued one drilling permit, issued June 12, 2014, permitted to 9,763 ft.

It was permitted by SN Operating, LLC and has since transferred to Javelin Energy Partners Mgmt LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Yegua, Wilcox, Navarro, Escondido.

Its 2 leases have reported 53.3K barrels of oil and 462K mcf of gas since February 2013, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Javelin Energy Partners Mgmt LLC

Permitted by SN Operating, LLC; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Feb 24, 2026
Permits on file
233
Phone
(469) 575-3800

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJavelin Energy Partners Mgmt LLC
Production reportsJavelin Energy Partners Mgmt LLCthrough Jul 2025
Latest permitSN Operating, LLCJun 12, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,763
total depth, ft
1
permits on file
Jun 12, 2014
last permit issued
Sep 12, 2014
completed
53.3K
cumulative oil, bbl
462K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 12, 2014
Shut in
Aug 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gran Torino A G-1-291290Eagleville (Eagle Ford-1)Javelin Energy Partners Mgmt LLC10215KSep 2014 – Jul 2026
Gran Torino A O-1-16708Eagleville (Eagle Ford-1)Javelin Energy Partners Mgmt LLC453.3K246KFeb 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 2 · prior 12 1,133(-100%)

0200400600202420252026

Gas, mcf lease total

Last 12 months 568 · prior 12 6,932(-92%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Callon (Eagle Ford) LLCSep 2014 → Jun 2023
  2. 2Carrizo (Eagle Ford) LLCJan 2018 → Jan 2020
  3. 3Ridgemar Energy Operating, LLCJul 2023 → Jan 2025
  4. 4Javelin Energy Partners Mgmt LLCFeb 2025 → Jul 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
787108-99DrillSN Operating, LLCMay 14, 2014Jun 12, 2014Jun 27, 201413,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 12, 2014Gran Torino A G-1-291290Eagleville (Eagle Ford-1)Javelin Energy Partners Mgmt LLCTemp Abandoned · shut in Aug 1, 20259,763
Sep 12, 2014Gran Torino A O-1-16708Eagleville (Eagle Ford-1)Javelin Energy Partners Mgmt LLCNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 323 ft elevation.Download CSV →

FormationMD ftSubsea
YeguaYEGUA - DISPOSAL22499
WilcoxWILCOX - DISPOSAL4,974-4,651
Navarro7,075-6,752
Escondido7,156-6,833
Olmos8,214-7,891
Anacacho9,556-9,233
Austin Chalk9,665-9,342
Eagle FordEAGLE FORD - H2S10,098-9,775
CatahoulaCATAHOULA - DISPOSAL——
FrioFRIO - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
10,50715,422Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,54212.251,680 S
5.515,5178.751,990 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 13, 2021Aug 25, 2021—
00Jun 11, 2015Feb 17, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31136094, documented in the API reference.