TEXAS · WELLS · MCMULLEN COUNTY · GLADYS WHEELER UNIT 4 LEASE · API 42-311-36329 · DISTRICT 01

Gladys Wheeler Unit 4 #15H

Plugged

McMullen County · Eagleville (Eagle Ford-1) field  · Horizontal

Gladys Wheeler Unit 4 #15H (API 42-311-36329) is a plugged horizontal well in Mcmullen County, plugged June 28, 2024, last operated by Bpx Operating Company.

The RRC has issued one drilling permit, issued October 28, 2014, permitted to 14,000 ft.

It was permitted by Bhp Billiton Pet(Txla OP) CO and has since transferred to Bpx Operating Company on the wellbore schedule.

Completion filings report 12 formation tops, including Sparta, Queen City, Wilcox, Escondido.

Operator of record

BPX Operating Company

Permitted by BHP Billiton Pet(txla OP) Co; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active – Extension (X)
P-5 last filed
Jun 24, 2026
Permits on file
1,576
Phone
(720) 439-5104

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBPX Operating Company
Production reportsBPX Operating Companythrough Aug 2022
Latest permitBHP Billiton Pet(txla OP) CoOct 28, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
1
permits on file
Oct 28, 2014
last permit issued
Jun 25, 2015
completed
0
cumulative oil, bbl
1.52M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2014 THROUGH Oct 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 25, 2015
Shut in
—
Plugged
Jun 28, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Gladys Wheeler Unit 4 G-1-277607Eagleville (Eagle Ford-1)BPX Operating Company101.52MDec 2014 – Oct 2024

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1BHP Billiton Pet(txla OP) CoJun 2015 → Jul 2019
  2. 2BPX Operating CompanyAug 2019 → Aug 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
799072-99DrillBHP Billiton Pet(txla OP) CoOct 27, 2014Oct 28, 2014Mar 22, 201514,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 25, 2015Gladys Wheeler Unit 4 G-1-277607Eagleville (Eagle Ford-1)BPX Operating CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 350 ft elevation.Download CSV →

FormationMD ftSubsea
Sparta2,395-2,045
Queen City2,655-2,305
WilcoxWILCOX - DISPOSAL4,345-3,995
Escondido8,565-8,215
Navarro8,565-8,215
Olmos9,656-9,306
Anacacho11,029-10,679
Austin Chalk11,768-11,418
Eagle FordEAGLE FORD - H2S11,777-11,427
CatahoulaCATAHOULA - DISPOSAL——
FrioFRIO - DISPOSAL——
YeguaYEGUA - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
12,00818,082Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,05012.251,420 S
5.59,7868.75970 S
4.518,1936.75970 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 24, 2015Oct 12, 2015Yes
00Aug 26, 2015Jun 3, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31136329, documented in the API reference.