TEXAS · WELLS · MADISON COUNTY · GAYLOR LEASE · API 42-313-30900 · DISTRICT 03
Gaylor #1
Madison County · Fort Trinidad East (Buda) field · Vertical
Gaylor #1 (API 42-313-30900) is a plugged well in Madison County, plugged April 10, 2019, last operated by Burk Royalty CO. Ltd..
The RRC has issued one drilling permit (amended twice), issued October 28, 2011, permitted to 15,500 ft.
Completion filings report 7 formation tops, including Austin Chalk, Woodbine, Buda, Del Rio.
Its lease has reported 37.9K barrels of oil and 133K mcf of gas since January 2012, last reporting in July 2026.
Operator of record
- Based in
- Wichita Falls, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 4, 2025
- Permits on file
- 383
- Phone
- (940) 397-8600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Burk Royalty Co. Ltd. |
| Production reports | Burk Royalty Co., Ltd.through Sep 2018 |
| Latest permit | Burk Royalty Co., Ltd.Oct 28, 2011 |
- 15,500
- total depth, ft
- 3
- permits on file
- Oct 28, 2011
- last permit issued
- Jan 10, 2012
- completed
- 37.9K
- cumulative oil, bbl
- 133K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 10, 2012
- Shut in
- —
- Plugged
- Apr 10, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Gaylor O-3-26048 | Fort Trinidad, East (Buda) | Burk Royalty Co., Ltd. | 1 | 37.9K | 133K | Jan 2012 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Burk Royalty Co., Ltd.Feb 2012 → Jan 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 726745-97 | Drill | Burk Royalty Co., Ltd. | Jul 13, 2012 | Oct 28, 2011 | Nov 7, 2011 | 15,500 |
| 726745-98 | Drill | Burk Royalty Co., Ltd. | Mar 27, 2012 | Oct 28, 2011 | Nov 7, 2011 | 15,500 |
| 726745-99 | Drill | Burk Royalty Co., Ltd. | Oct 21, 2011 | Oct 28, 2011 | Nov 7, 2011 | 15,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 10, 2012 | Gaylor O-3-26048 | Fort Trinidad East (Buda) | Burk Royalty Co. Ltd. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 268 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 8,637 | -8,369 |
| Woodbine | 8,940 | -8,672 |
| Buda | 9,903 | -9,635 |
| Del Rio | 9,967 | -9,699 |
| Georgetown | 9,990 | -9,722 |
| Edwards | 10,480 | -10,212 |
| Glen Rose | 11,038 | -10,770 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,904 | 12,089 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,340 | 12.25 | 875 S |
| 7 | 9,980 | 8.75 | 1,320 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 13, 2013 | Oct 29, 2012 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-313-30900 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-313-30900 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31330900, documented in the API reference.