WELL · 42-313-30991 · DISTRICT 3
Maverick #1H
Madison County · Halliday (Woodbine) field · Shut IN · Horizontal
Maverick #1H (API 42-313-30991) is a horizontal well in Madison County operated by Empire Texas Operating LLC, completed March 13, 2014 and listed as shut in on the RRC schedule, shut in June 1, 2013.
The RRC has issued one drilling permit (amended once), issued April 23, 2013, permitted to 8,551 ft.
It was permitted by Energy & Expl. Prtnrs Oper., LP and has since transferred to Empire Texas Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Pecan Gap, Austin Chalk, Woodbine.
Its lease has reported 70 barrels of oil and 25 mcf of gas since June 2013, last reporting in July 2026.
Operator of record
Permitted by Energy & Expl. Prtnrs Oper., LP; the EWA schedule now lists a different operator.
- Based in
- The Woodlands, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Feb 17, 2026
- Permits on file
- 18
- Phone
- (539) 444-8002
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Empire Texas Operating LLC |
| Production reports | Energy & Expl. Prtnrs Oper., LPthrough Apr 2014 |
| Latest permit | Energy & Expl. Prtnrs Oper., LPApr 23, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,551
- total depth, ft
- 2
- permits on file
- Apr 23, 2013
- last permit issued
- Mar 13, 2014
- completed
- 70
- cumulative oil, bbl
- 25
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 13, 2014
- Shut in
- Jun 1, 2013
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Maverick O-3-26347 | Halliday (Woodbine) | Empire Texas Operating LLC | 1 | 70 | 25 | Jun 2013 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Energy & Expl. Prtnrs Oper., LPJul 2013 → Apr 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 761157-98 | Drill | Energy & Expl. Prtnrs Oper., LP | Jan 14, 2014 | Apr 23, 2013 | May 6, 2013 | 9,000 |
| 761157-99 | Drill | Energy & Expl. Prtnrs Oper., LP | Apr 19, 2013 | Apr 23, 2013 | May 6, 2013 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 13, 2014 | Maverick O-3-26347 | Halliday (Woodbine) | Empire Texas Operating LLC | Shut IN · shut in Jun 1, 2013 | 8,551 |
Formation tops
As filed on W-2/G-1. Subsea from 322 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Gap | 6,292 | -5,970 |
| Austin Chalk | 7,118 | -6,796 |
| Woodbine | 7,993 | -7,671 |
| Austin Chalk | — | — |
| Pecan Gap | — | — |
| Woodbine | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,828 | 16,109 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 4,220 | 13.5 | 2,178 S |
| 7.625 | 8,677 | 9.875 | 807 S |
| 5.5 | 9,019 | 6.25 | 1,239 S |
| 5.5 | 16,242 | 6.25 | 1,239 S |
| 4.5 | 16,242 | 6.25 | 1,239 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 21, 2015 | Sep 2, 2014 | — |
| 00 | Jun 24, 2014 | Jan 2, 2014 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-313-30991 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-313-30991 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31330991, documented in the API reference.