WELL · 42-313-30998 · DISTRICT 3

Spot Bullard McMahan #1H

Y

Madison County · Halliday (Woodbine) field · Shut IN  · Horizontal

Spot Bullard Mcmahan #1H (API 42-313-30998) is a horizontal well in Madison County operated by Empire Texas Operating LLC, completed July 29, 2013 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued May 2, 2013, permitted to 9,000 ft.

It was permitted by Energy & Expl. Prtnrs Oper., LP and has since transferred to Empire Texas Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Austin Chalk, Pecan Gap, Woodbine.

Its lease has reported 48.2K barrels of oil and 108K mcf of gas since July 2013, last reporting in July 2026.

Operator of record

Empire Texas Operating LLC

Permitted by Energy & Expl. Prtnrs Oper., LP; the EWA schedule now lists a different operator.

Based in
The Woodlands, TX
P-5 status
Active – Extension (X)
P-5 last filed
Feb 17, 2026
Permits on file
18
Phone
(539) 444-8002

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEmpire Texas Operating LLC
Production reportsEmpire Texas Operating LLCthrough Mar 2025
Latest permitEnergy & Expl. Prtnrs Oper., LPMay 2, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
2
permits on file
May 2, 2013
last permit issued
Jul 29, 2013
completed
48.2K
cumulative oil, bbl
108K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 29, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Spot Bullard McMahan O-3-26338Halliday (Woodbine)Empire Texas Operating LLC148.2K108KJul 2013 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 50(-100%)

05001K1.5K202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Energy & Expl. Prtnrs Oper., LPJul 2013 → Sep 2016
  2. 2Pardus Oil & Gas Operating, LPOct 2016 → Apr 2022
  3. 3Empire Texas Operating LLCMay 2022 → Jan 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
761705-98DrillEnergy & Expl. Prtnrs Oper., LPJan 14, 2014May 2, 2013May 21, 20139,000
761705-99DrillEnergy & Expl. Prtnrs Oper., LPApr 30, 2013May 2, 2013May 21, 20139,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-26338————

Formation tops

As filed on W-2/G-1. Subsea from 341 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk——
Pecan Gap——
Woodbine——

Perforations

Perforated and open-hole intervals.

FromToType
9,18815,561Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.754,32313.52,113 S
5.57,4186.7580 S
7.6259,1759.875917 S
4.515,7486.751,273 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 13, 2014Jan 2, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31330998, documented in the API reference.