WELL · 42-313-31009 · DISTRICT 3

Quick Draw #1H

Y

Madison County · Halliday (Woodbine) field · Shut IN  · Horizontal

Quick Draw #1H (API 42-313-31009) is a horizontal well in Madison County operated by Empire Texas Operating LLC, completed December 24, 2013 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued June 6, 2013, permitted to 9,000 ft.

It was permitted by Energy & Expl. Prtnrs Oper., LP and has since transferred to Empire Texas Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Austin Chalk, Pecan Gap, Woodbine.

Its lease has reported 5.04K barrels of oil and 22 mcf of gas since September 2013, last reporting in July 2026.

Operator of record

Empire Texas Operating LLC

Permitted by Energy & Expl. Prtnrs Oper., LP; the EWA schedule now lists a different operator.

Based in
The Woodlands, TX
P-5 status
Active – Extension (X)
P-5 last filed
Feb 17, 2026
Permits on file
18
Phone
(539) 444-8002

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEmpire Texas Operating LLC
Production reportsEnergy & Expl. Prtnrs Oper., LPthrough Jun 2016
Latest permitEnergy & Expl. Prtnrs Oper., LPJun 6, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
3
permits on file
Jun 6, 2013
last permit issued
Dec 24, 2013
completed
5.04K
cumulative oil, bbl
22
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 24, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Quick Draw O-3-26346Halliday (Woodbine)Empire Texas Operating LLC15.04K22Sep 2013 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Energy & Expl. Prtnrs Oper., LPJan 2014 → Jun 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
763822-97DrillEnergy & Expl. Prtnrs Oper., LPJan 16, 2014Jun 6, 2013Jul 2, 20139,000
763822-98DrillEnergy & Expl. Prtnrs Oper., LPAug 23, 2013Jun 6, 2013Jul 2, 20139,000
763822-99DrillEnergy & Expl. Prtnrs Oper., LPJun 3, 2013Jun 6, 2013Jul 2, 20139,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-26346————

Formation tops

As filed on W-2/G-1. Subsea from 328 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk——
Pecan Gap——
Woodbine——

Perforations

Perforated and open-hole intervals.

FromToType
14,83014,974Perforated
15,46215,626Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.754,25013.51,695 S
10.754,40013.51,695 S
5.514,4438.752,824 S
5.515,7268.752,624 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 17, 2014Aug 28, 2014—
00Jun 24, 2014Jan 2, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31331009, documented in the API reference.