WELL · 42-313-31046 · DISTRICT 3

Henry #1

Y

Madison County · FT Trinidad E. (Edwards -A-) field · SWR-10-Well  · Vertical

Henry #1 (API 42-313-31046) is a well in Madison County operated by E2 Operating LLC, completed November 14, 2013 and listed as swr-10-well on the RRC schedule.

The RRC has issued one drilling permit, issued October 22, 2013, permitted to 13,000 ft.

It was permitted by Burk Royalty CO., Ltd. and has since transferred to E2 Operating LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Pecan Gap, Austin Chalk, Woodbine, Dexter.

No lease production has been reported under this well’s leases.

Operator of record

E2 Operating LLC

Permitted by Burk Royalty Co., Ltd.; the EWA schedule now lists a different operator.

Based in
Tulsa, OK
P-5 status
Active – Extension (X)
P-5 last filed
Jun 17, 2026
Phone
(918) 270-9927

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleE2 Operating LLC
Production reportsE2 Operating LLCthrough Mar 2026
Latest permitBurk Royalty Co., Ltd.Oct 22, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
1
permits on file
Oct 22, 2013
last permit issued
Nov 14, 2013
completed
0
cumulative oil, bbl
212K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 14, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Henry G-3-278443Fort Trinidad (Glen Rose, Upper)E2 Operating LLC10212KNov 2013 – Jul 2026
Henry G-3-278456Fort Trinidad, East (Georgetown)E2 Operating LLC100Nov 2013 – Jul 2026
Henry G-3-279474Fort Trinidad, East (Buda)E2 Operating LLC100Mar 2014 – Jul 2026
Henry G-3-279547FT Trinidad, E. (Edwards -A-)E2 Operating LLC100Mar 2014 – Jul 2026

Gas, mcf lease total

Last 12 months 263 · prior 12 0

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Burk Royalty Co., Ltd.Feb 2014 → Jul 2023
  2. 2E2 Operating LLCAug 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
771632-99DrillBurk Royalty Co., Ltd.Oct 11, 2013Oct 22, 2013Oct 30, 201313,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-278443————
—— G-3-278456————
—— G-3-279474————
—— G-3-279547————

Formation tops

As filed on W-2/G-1. Subsea from 212 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap7,917-7,705
Austin ChalkAUSTIN CHAL8,610-8,398
Austin Chalk8,610-8,398
Woodbine8,900-8,688
Dexter9,334-9,122
Buda9,724-9,512
Georgetown9,810-9,598
Edwards10,121-9,909
Kiamichi10,191-9,979
Edwards10,212-10,000
Paluxy10,681-10,469
Glen Rose10,858-10,646

Perforations

Perforated and open-hole intervals.

FromToType
9,7249,790Perforated
9,8209,853Perforated
10,22110,610Perforated
10,97311,072Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,31312.25815 S
5.511,6508.751,060 S
5.511,650—1,060 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 31, 2016May 5, 2015—
00Mar 23, 2016May 5, 2015—
00Nov 23, 2015May 5, 2015—
00Nov 20, 2015Apr 10, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31331046, documented in the API reference.