TEXAS · WELLS · MADISON COUNTY · API 42-313-31049 · DISTRICT 03
Slaughter #1
Madison County · FT Trinidad E. (Edwards -A-) field · Vertical
Slaughter #1 (API 42-313-31049) is a plugged well in Madison County, plugged August 22, 2022, last operated by Burk Royalty CO. Ltd..
The RRC has issued one drilling permit, issued October 31, 2013, permitted to 13,500 ft.
Completion filings report 10 formation tops, including Nacatoch, Pecan Gap, Taylor, Austin Chalk.
Operator of record
- Based in
- Wichita Falls, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 4, 2025
- Permits on file
- 384
- Phone
- (940) 397-8600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Burk Royalty Co. Ltd. |
| Production reports | Buffco Production Inc.through Jul 2022 |
| Latest permit | Burk Royalty Co., Ltd.Oct 31, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,500
- total depth, ft
- 1
- permits on file
- Oct 31, 2013
- last permit issued
- Apr 27, 2014
- completed
- 0
- cumulative oil, bbl
- 63.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2014 THROUGH Jun 2023
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 27, 2014
- Shut in
- —
- Plugged
- Aug 22, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Slaughter G-3-279361 | Fort Trinidad (Glen Rose, Upper) | Buffco Production Inc. | 1 | 0 | 63.1K | Apr 2014 – Jun 2023 |
| Slaughter G-3-279385 | Fort Trinidad, East (Buda) | Burk Royalty Co., Ltd. | 1 | 0 | 0 | Apr 2014 – Aug 2022 |
| Slaughter G-3-279390 | Fort Trinidad, East (Georgetown) | Burk Royalty Co., Ltd. | 1 | 0 | 0 | Apr 2014 – Aug 2022 |
| Slaughter G-3-279414 | FT Trinidad, E. (Edwards -A-) | Burk Royalty Co., Ltd. | 1 | 0 | 0 | Apr 2014 – Aug 2022 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Burk Royalty Co., Ltd.May 2014 → Dec 2020
- 2Buffco Production Inc.Mar 2021 → Jul 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 772423-99 | Drill | Burk Royalty Co., Ltd. | Oct 24, 2013 | Oct 31, 2013 | Nov 24, 2013 | 13,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 27, 2014 | Slaughter G-3-279390 | Fort Trinidad East (Georgetown) | Burk Royalty Co. Ltd. | Plugged | — |
| Apr 27, 2014 | Slaughter G-3-279414 | FT Trinidad E. (Edwards -A-) | Burk Royalty Co. Ltd. | Plugged | — |
| Apr 27, 2014 | Slaughter G-3-279385 | Fort Trinidad East (Buda) | Burk Royalty Co. Ltd. | Plugged | — |
| Apr 27, 2014 | Slaughter G-3-279361 | Fort Trinidad (Glen Rose Upper) | Buffco Production Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 241 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Nacatoch | 7,327 | -7,086 |
| Pecan Gap | 7,662 | -7,421 |
| Taylor | 8,170 | -7,929 |
| Austin Chalk | 8,345 | -8,104 |
| Eagle FordEAGLEFORD | 8,628 | -8,387 |
| Woodbine | 8,770 | -8,529 |
| Dexter | 9,170 | -8,929 |
| Buda | 9,595 | -9,354 |
| Del Rio | 9,661 | -9,420 |
| Georgetown | 9,676 | -9,435 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,565 | 9,662 | Perforated |
| 9,595 | 9,662 | Perforated |
| 9,686 | 9,743 | Perforated |
| 9,686 | 9,746 | Perforated |
| 10,103 | 10,539 | Perforated |
| 10,861 | 11,422 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 11.75 | 2,193 | 16 | 1,050 S |
| 8.625 | 6,018 | 11 | 295 S |
| 5.5 | 11,750 | 7.875 | 545 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 18, 2016 | May 5, 2015 | Yes |
| 00 | Mar 17, 2016 | May 5, 2015 | Yes |
| 00 | Mar 16, 2016 | May 5, 2015 | Yes |
| 00 | Mar 15, 2016 | May 5, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-313-31049 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-313-31049 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31331049, documented in the API reference.