TEXAS · WELLS · MADISON COUNTY · API 42-313-31049 · DISTRICT 03

Slaughter #1

Plugged

Madison County · FT Trinidad E. (Edwards -A-) field  · Vertical

Slaughter #1 (API 42-313-31049) is a plugged well in Madison County, plugged August 22, 2022, last operated by Burk Royalty CO. Ltd..

The RRC has issued one drilling permit, issued October 31, 2013, permitted to 13,500 ft.

Completion filings report 10 formation tops, including Nacatoch, Pecan Gap, Taylor, Austin Chalk.

Operator of record

Burk Royalty Co. Ltd.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Dec 4, 2025
Permits on file
384
Phone
(940) 397-8600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBurk Royalty Co. Ltd.
Production reportsBuffco Production Inc.through Jul 2022
Latest permitBurk Royalty Co., Ltd.Oct 31, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,500
total depth, ft
1
permits on file
Oct 31, 2013
last permit issued
Apr 27, 2014
completed
0
cumulative oil, bbl
63.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2014 THROUGH Jun 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 27, 2014
Shut in
—
Plugged
Aug 22, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Slaughter G-3-279361Fort Trinidad (Glen Rose, Upper)Buffco Production Inc.1063.1KApr 2014 – Jun 2023
Slaughter G-3-279385Fort Trinidad, East (Buda)Burk Royalty Co., Ltd.100Apr 2014 – Aug 2022
Slaughter G-3-279390Fort Trinidad, East (Georgetown)Burk Royalty Co., Ltd.100Apr 2014 – Aug 2022
Slaughter G-3-279414FT Trinidad, E. (Edwards -A-)Burk Royalty Co., Ltd.100Apr 2014 – Aug 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Burk Royalty Co., Ltd.May 2014 → Dec 2020
  2. 2Buffco Production Inc.Mar 2021 → Jul 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
772423-99DrillBurk Royalty Co., Ltd.Oct 24, 2013Oct 31, 2013Nov 24, 201313,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 27, 2014Slaughter G-3-279390Fort Trinidad East (Georgetown)Burk Royalty Co. Ltd.Plugged—
Apr 27, 2014Slaughter G-3-279414FT Trinidad E. (Edwards -A-)Burk Royalty Co. Ltd.Plugged—
Apr 27, 2014Slaughter G-3-279385Fort Trinidad East (Buda)Burk Royalty Co. Ltd.Plugged—
Apr 27, 2014Slaughter G-3-279361Fort Trinidad (Glen Rose Upper)Buffco Production Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 241 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch7,327-7,086
Pecan Gap7,662-7,421
Taylor8,170-7,929
Austin Chalk8,345-8,104
Eagle FordEAGLEFORD8,628-8,387
Woodbine8,770-8,529
Dexter9,170-8,929
Buda9,595-9,354
Del Rio9,661-9,420
Georgetown9,676-9,435

Perforations

Perforated and open-hole intervals.

FromToType
9,5659,662Perforated
9,5959,662Perforated
9,6869,743Perforated
9,6869,746Perforated
10,10310,539Perforated
10,86111,422Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
11.752,193161,050 S
8.6256,01811295 S
5.511,7507.875545 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 18, 2016May 5, 2015Yes
00Mar 17, 2016May 5, 2015Yes
00Mar 16, 2016May 5, 2015Yes
00Mar 15, 2016May 5, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31331049, documented in the API reference.