TEXAS · WELLS · MADISON COUNTY · LAURA-MANNING (ALLOC) UNIT LEASE · API 42-313-31153 · DISTRICT 03

Laura-Manning (Alloc) Unit #1H

Shut in

Madison County · Fort Trinidad (Glen Rose) field · Producing  · Horizontal

Laura-Manning (Alloc) Unit #1H (API 42-313-31153) is a horizontal well in Madison County operated by Eog Resources Inc., completed November 27, 2014 and listed as producing on the RRC schedule, shut in May 1, 2020.

The RRC has issued one drilling permit (amended once), issued July 11, 2014, permitted to 11,662 ft.

Completion filings report 10 formation tops, including Wilcox, Lewisville - Disposal, Sub-Clarksville, Eagle Ford.

Its lease has reported 7K barrels of oil and 333K mcf of gas since November 2014, with no volume in the three years through April 2026.

Operator of record

EOG Resources Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,354
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsEOG Resources, Inc.through Jan 2024
Latest permitEOG Resources, Inc.Jul 11, 2014
11,662
total depth, ft
2
permits on file
Jul 11, 2014
last permit issued
Nov 27, 2014
completed
7K
cumulative oil, bbl
333K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2014 THROUGH Jan 2024

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 27, 2014
Shut in
May 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Laura-Manning (Alloc) Unit G-3-278186Fort Trinidad (Glen Rose)EOG Resources, Inc.17K333KNov 2014 – Jan 2024

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.Nov 2014 → Oct 2021

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
787861-98DrillEOG Resources, Inc.Feb 19, 2015Jul 11, 2014Jul 21, 201411,500
787861-99DrillEOG Resources, Inc.May 23, 2014Jul 11, 2014Jul 21, 201411,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 27, 2014Laura-Manning (Alloc) Unit G-3-278186Fort Trinidad (Glen Rose)EOG Resources Inc.Producing · shut in May 1, 202011,662

Formation tops

As filed on W-2/G-1. Subsea from 250 ft elevation.Download CSV →

FormationMD ftSubsea
WilcoxWILCOX - DISPOSAL2,080-1,830
Lewisville - Disposal9,018-8,768
Sub-Clarksville9,018-8,768
Eagle FordEAGLEFORD9,120-8,870
Woodbine9,180-8,930
BudaBUDA - DISPOSAL——
Dex-Buda——
FrioFRIO - DISPOSAL——
Georgetown——
RodessaRODESSA - H2S——

Perforations

Perforated and open-hole intervals.

FromToType
12,10416,330Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.752,51317.51,760 S
5.510,4927.625140 S
7.62510,8859.875240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 22, 2015Feb 27, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31331153, documented in the API reference.