WELL · 42-313-31296 · DISTRICT 3
Rader #1
Madison County · Fort Trinidad (Glen Rose Upper) field · Producing · Vertical
Rader #1 (API 42-313-31296) is a well in Madison County operated by E2 Operating LLC, completed May 6, 2021 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued May 1, 2015, permitted to 11,455 ft.
It was permitted by Burk Royalty CO., Ltd. and has since transferred to E2 Operating LLC on the wellbore schedule.
Completion filings report 13 formation tops, including Austin Chalk, Woodbine, Dexter, Lewisville - Disposal.
Its 5 leases have reported 810 barrels of oil and 310K mcf of gas since October 2015, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Burk Royalty Co., Ltd.; the EWA schedule now lists a different operator.
- Based in
- Tulsa, OK
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Jun 17, 2026
- Phone
- (918) 270-9927
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Burk Royalty Co. Ltd. |
| Production reports | E2 Operating LLCthrough Mar 2026 |
| Latest permit | Burk Royalty Co., Ltd.May 1, 2015 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,455
- total depth, ft
- 2
- permits on file
- May 1, 2015
- last permit issued
- May 6, 2021
- completed
- 810
- cumulative oil, bbl
- 310K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2015 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 6, 2021
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rader O-3-27910 | Fort Trinidad (Glen Rose, Upper) | E2 Operating LLC | 1 | 810 | 0 | May 2021 – Jul 2026 |
| Rader G-3-281343 | Fort Trinidad (Glen Rose, Upper) | E2 Operating LLC | 1 | 0 | 310K | Oct 2015 – Mar 2025 |
| Rader G-3-281369 | Fort Trinidad, East (Buda) | Burk Royalty Co., Ltd. | 1 | 0 | 0 | Oct 2015 – May 2021 |
| Rader G-3-281406 | Fort Trinidad, East (Georgetown) | Burk Royalty Co., Ltd. | 1 | 0 | 0 | Oct 2015 – May 2021 |
| Rader G-3-281434 | FT Trinidad, E. (Edwards -A-) | Burk Royalty Co., Ltd. | 1 | 0 | 0 | Oct 2015 – May 2021 |
Oil, barrels lease total
Last 12 months 221 · prior 12 285(-22%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Burk Royalty Co., Ltd.Oct 2015 → Jun 2021
- 2E2 Operating LLCAug 2023 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 806090-98 | Drill | Burk Royalty Co., Ltd. | Jul 26, 2016 | May 1, 2015 | Aug 9, 2015 | 13,000 |
| 806090-99 | Drill | Burk Royalty Co., Ltd. | Apr 29, 2015 | May 1, 2015 | Aug 9, 2015 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 6, 2021 | Rader O-3-27910 | Fort Trinidad (Glen Rose Upper) | E2 Operating LLC | Producing | 11,455 |
| Oct 7, 2015 | Rader G-3-281406 | Fort Trinidad East (Georgetown) | Burk Royalty Co. Ltd. | Not on Schedule | — |
| Oct 7, 2015 | Rader G-3-281434 | FT Trinidad E. (Edwards -A-) | Burk Royalty Co. Ltd. | Not on Schedule | — |
| Oct 7, 2015 | Rader G-3-281369 | Fort Trinidad East (Buda) | Burk Royalty Co. Ltd. | Not on Schedule | — |
| Oct 7, 2015 | Rader G-3-281343 | Fort Trinidad (Glen Rose Upper) | E2 Operating LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 253 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 8,100 | -7,847 |
| Woodbine | 8,520 | -8,267 |
| Dexter | 8,810 | -8,557 |
| Lewisville - Disposal | 8,810 | -8,557 |
| Buda | 9,333 | -9,080 |
| BudaBUDA - DISPOSAL | 9,333 | -9,080 |
| Dex-Buda | 9,333 | -9,080 |
| Del Rio | 9,420 | -9,167 |
| Georgetown | 9,434 | -9,181 |
| BudaBUDA - DISPOSAL | — | — |
| Eagle FordEAGLEFORD | — | — |
| FrioFRIO - DISPOSAL | — | — |
| Lewisville - Disposal | — | — |
| RodessaRODESSA - H2S | — | — |
| Sub-Clarksville | — | — |
| WilcoxWILCOX - DISPOSAL | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,244 | 9,252 | Perforated |
| 9,333 | 9,410 | Perforated |
| 9,434 | 9,467 | Perforated |
| 9,899 | 10,356 | Perforated |
| 10,662 | 11,200 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,096 | 12.25 | 940 S |
| 5.5 | 11,455 | 8.75 | 730 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 27, 2021 | Jul 13, 2021 | — |
| 00 | Dec 6, 2016 | Aug 30, 2016 | Yes |
| 00 | Dec 1, 2016 | Aug 30, 2016 | — |
| 00 | Nov 30, 2016 | Aug 30, 2016 | — |
| 00 | Nov 29, 2016 | Aug 30, 2016 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-313-31296 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-313-31296 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31331296, documented in the API reference.