WELL · 42-317-32024 · DISTRICT 8

Langham #1-24

Plugged

Martin County · Ackerly (Dean Sand) field  · Vertical

Langham #1-24 (API 42-317-32024) is a plugged well in Martin County, plugged March 5, 2025, last operated by Diamondback E&P LLC.

The RRC has issued one drilling permit, issued August 7, 1978, permitted to 8,710 ft.

It was permitted by Maguire Oil Company and has since transferred to Diamondback E&P LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Spraberry, Jo Mill, Dean.

Its 2 leases have reported 38.4K barrels of oil and 161K mcf of gas since January 1993, last reporting in April 2025. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Diamondback E&P LLC

Permitted by Maguire Oil Company; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active – Extension (X)
P-5 last filed
May 4, 2026
Permits on file
5,237
Phone
(432) 221-7400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDiamondback E&P LLC
Production reportsEnergen Resources Corporationthrough Jan 2018
Latest permitMaguire Oil CompanyAug 7, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,710
total depth, ft
1
permits on file
Aug 7, 1978
last permit issued
Nov 22, 1978
completed
38.4K
cumulative oil, bbl
161K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2025

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 22, 1978
Shut in
—
Plugged
Mar 5, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Langham O-11-60265Ackerly (Dean Sand)Diamondback E&P LLC438.4K158KJan 1993 – Apr 2025
Langham G-11-282070Ackerly (Dean Sand)Diamondback E&P LLC103.03KOct 2016 – Feb 2025

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Maguire Oil CompanyJan 1993 → Sep 2004
  2. 2Enervest Operating, L.L.C.Oct 2004 → Dec 2005
  3. 3Energen Resources CorporationJan 2006 → Jan 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
30132-99DrillMaguire Oil CompanyAug 7, 1978Aug 7, 1978—8,710

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 22, 1978Langham G-11-282070Ackerly (Dean Sand)Diamondback E&P LLCPlugged—
Nov 22, 1978Langham O-11-60265Ackerly (Dean Sand)Diamondback E&P LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,695 ft elevation.Download CSV →

FormationMD ftSubsea
SpraberryLOWER SPRABERRY7,560-4,865
Jo Mill7,930-5,235
DeanDEAN SAND8,404-5,709

Perforations

Perforated and open-hole intervals.

FromToType
8,4198,623Perforated
—8,623Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
12.7533317.5350 S
12.7533817.5350 S
8.6253,62011250 S
4.58,7107.8751,080 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 12, 2017Mar 6, 2017—
00Jan 12, 1984Dec 7, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31732024, documented in the API reference.