TEXAS · WELLS · MARTIN COUNTY · DAVIS, MONROE LEASE · API 42-317-32328 · DISTRICT 7B

Davis Monroe #2

Plugged

Martin County · Ackerly (Dean Sand) field  · Vertical

Davis Monroe #2 (API 42-317-32328) is a plugged well in Martin County, plugged July 20, 2022, last operated by SM Energy Company.

The RRC has issued one drilling permit, issued February 5, 1981, permitted to 8,700 ft.

It was permitted by Brown, H. L., JR. and has since transferred to SM Energy Company on the wellbore schedule.

Completion filings report 3 formation tops, including Spraberry, Jo Mill, Dean.

Its lease has reported 17K barrels of oil and 234K mcf of gas since January 1993, last reporting in August 2022. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

SM Energy Company

Permitted by Brown, H. L., Jr.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Sep 3, 2025
Permits on file
2,485
Phone
(303) 861-8140

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSM Energy Company
Production reportsSM Energy Companythrough Sep 2020
Latest permitBrown, H. L., Jr.Feb 5, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,700
total depth, ft
1
permits on file
Feb 5, 1981
last permit issued
May 8, 2017
completed
17K
cumulative oil, bbl
234K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 8, 2017
Shut in
—
Plugged
Jul 20, 2022

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis, Monroe O-11-60511Ackerly (Dean Sand)SM Energy Company217K234KJan 1993 – Aug 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Perry Co.Jan 1993 → Apr 1993
  2. 2Perry Producing Company, Inc.May 1993 → Oct 2007
  3. 3Endeavor Energy Resources L.P.Nov 2007 → Apr 2016
  4. 4Qstar Operating LLCMay 2016 → Dec 2016
  5. 5SM Energy CompanyJan 2017 → Sep 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
107600-99DrillBrown, H. L., Jr.Feb 5, 1981Feb 5, 1981—8,700

Completions

CompletedLeaseFieldOperatorStatusDepth
May 8, 2017Davis Monroe O-11-60511Ackerly (Dean Sand)SM Energy CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,725 ft elevation.Download CSV →

FormationMD ftSubsea
Spraberry6,847-4,122
SpraberryLOWER SPRABERRY7,540-4,815
Jo Mill7,870-5,145
Dean8,363-5,638

Perforations

Perforated and open-hole intervals.

FromToType
8,4048,678Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37530017.5325 S
8.6254,00012.25730 S
2.3758,360——
4.58,7207.8751,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 21, 2017Jun 14, 2017—
00Jan 12, 1984Feb 24, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31732328, documented in the API reference.