WELL · 42-317-33915 · DISTRICT 8
University 7-3 #1
Martin County · Lacaff (Wolfcamp) field · Vertical
University 7-3 #1 (API 42-317-33915) is a plugged well in Martin County, plugged March 20, 1997, last operated by Mitchell Energy Corporation.
The RRC has issued 2 drilling permits between 1992 and 1995, permitted to 12,400 ft.
Completion filings report 6 formation tops, including Yates, Wolfcamp, Strawn, Mississippian.
Its 2 leases have reported 3.96K barrels of oil and 2.98K mcf of gas since January 1993, last reporting in August 1997. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jul 18, 2000
- Permits on file
- 4,224
- Phone
- (713) 377-5818
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mitchell Energy Corporation |
| Production reports | Mitchell Energy Corporationthrough Mar 1997 |
| Latest permit | Mitchell Energy CorporationFeb 16, 1995 |
- 12,400
- total depth, ft
- 2
- permits on file
- Feb 16, 1995
- last permit issued
- Mar 11, 1995
- completed
- 3.96K
- cumulative oil, bbl
- 2.98K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 11, 1995
- Shut in
- —
- Plugged
- Mar 20, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| University "7-3" O-10-34438 | Lacaff (Wolfcamp) | Mitchell Energy Corporation | 1 | 488 | 535 | Mar 1995 – Aug 1997 |
| University "7-3" O-10-33601 | Block 7 (Permo-Penn) | Mitchell Energy Corporation | 1 | 3.47K | 2.45K | Jan 1993 – Apr 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mitchell Energy CorporationJan 1993 → Mar 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 432951-99 | Recompletion | Mitchell Energy Corporation | Feb 15, 1995 | Feb 16, 1995 | Mar 7, 1995 | 9,900 |
| 401920-99 | Drill | Mitchell Energy Corporation | Aug 3, 1992 | Aug 3, 1992 | Aug 24, 1992 | 12,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-33601 | — | — | — | — |
| — | — O-10-34438 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,922 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,771 | 9,883 | Perforated |
| 10,639 | 10,682 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 362 | 17.5 | 365 S |
| 8.625 | 4,600 | 11 | 470 S |
| 5.5 | 12,216 | 7.875 | 660 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 5, 1995 | Mar 23, 1995 | Yes |
| 00 | Apr 10, 1995 | Oct 21, 1992 | Yes |
| 00 | Dec 23, 1992 | Oct 21, 1992 | Yes |
| 00 | Nov 6, 1992 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-317-33915 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-317-33915 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31733915, documented in the API reference.