TEXAS · WELLS · MARTIN COUNTY · API 42-317-34013 · DISTRICT 08

Johnson Ranch #400SW

Plugged

Martin County  · Vertical

Johnson Ranch #400SW (API 42-317-34013) is a plugged well in Martin County, plugged August 23, 1995, last operated by Rsp Permian, LLC.

The RRC has issued 2 drilling permits between 1995 and 2011, permitted to 6,000 ft.

Operator of record

RSP Permian, LLC

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Dec 3, 2019
Permits on file
941
Phone
(432) 683-7443

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitRSP Permian, LLCMay 4, 2011
6,000
total depth, ft
2
permits on file
May 4, 2011
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Aug 23, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
715390-99ReenterRSP Permian, LLCApr 29, 2011May 4, 2011—5,620
437794-99DrillHallwood Petroleum, Inc.Jul 13, 1995Jul 13, 1995Aug 8, 19956,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31734013, documented in the API reference.