WELL · 42-317-40732 · DISTRICT 8

Patricia Unit 2 #4805BH

Y

Martin County · Spraberry (Trend Area) field · Producing  · Horizontal

Patricia Unit 2 #4805BH (API 42-317-40732) is a horizontal well in Martin County operated by Xto Energy Inc., completed April 9, 2018 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 3, 2017, permitted to 8,988 ft.

Completion filings report 10 formation tops, including Santa Rosa, Yates, Queen, Grayburg.

Its 2 leases have reported 6.64M barrels of oil and 18.9M mcf of gas since May 2017, last reporting in July 2026. The leases carry 27 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.Apr 3, 2017
8,988
total depth, ft
1
permits on file
Apr 3, 2017
last permit issued
Apr 9, 2018
completed
6.64M
cumulative oil, bbl
18.9M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2017 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 9, 2018
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 27 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Patricia Unit 1 O-10-49155Spraberry (Trend Area)XTO Energy Inc.134.04M9.91MMay 2017 – Jul 2026
Patricia Unit 2 O-10-49653Spraberry (Trend Area)XTO Energy Inc.142.6M9.02MJul 2017 – Jul 2026

Oil, barrels lease total

Last 12 months 201,769 · prior 12 194,731(+4%)

020K40K60K202420252026

Gas, mcf lease total

Last 12 months 489,498 · prior 12 1,084,446(-55%)

0100K200K300K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Mar 2018 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
823773-99DrillXTO Energy Inc.Feb 27, 2017Apr 3, 2017Jul 24, 20179,230

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 9, 2018Patricia Unit 2 O-10-49653Spraberry (Trend Area)XTO Energy Inc.Producing8,988
Aug 14, 2017Patricia Unit 1 O-10-49155Spraberry (Trend Area)XTO Energy Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,681 ft elevation.Download CSV →

FormationMD ftSubsea
Santa Rosa1,0931,588
Yates2,348333
Queen3,466-785
Grayburg3,933-1,252
San AndresSAN ANDRES - ACTIVE CO2 FLOOD; H4,006-1,325
Spraberry7,189-4,508
Dean8,514-5,833
Wolfcamp8,702-6,021
Cisco——
Pennsylvanian——

Perforations

Perforated and open-hole intervals.

FromToType
9,46019,748Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,37417.51,100 S
9.6258,32312.251,495 S
5.519,8828.52,980 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 13, 2018Apr 17, 2018Yes
00Feb 15, 2018Oct 30, 2017Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31740732, documented in the API reference.