TEXAS · WELLS · MARTIN COUNTY · API 42-317-47153 · DISTRICT 7B

Mabee E1M #113H

Shut in

Martin County · Spraberry (Trend Area) field · Shut In  · Horizontal

Mabee E1m #113H (API 42-317-47153) is a horizontal well in Martin County operated by Pioneer Natural Res. USA Inc., completed March 30, 2026 and listed as shut in on the RRC schedule, shut in March 1, 2026.

The RRC has issued one drilling permit, issued January 21, 2026, permitted to 8,273 ft.

Completion filings report 10 formation tops, including Santa Rosa, Yates, Queen, Grayburg.

No lease production has been reported under this well’s leases.

Operator of record

Pioneer Natural Res. USA Inc.

Based in
Spring, TX
P-5 status
Active (A)
P-5 last filed
Jul 8, 2026
Permits on file
15,628
Phone
(972) 444-4001

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePioneer Natural Res. USA Inc.
Production reportsnone
Latest permitPioneer Natural Res. USA, Inc.Jan 21, 2026
8,273
total depth, ft
1
permits on file
Jan 21, 2026
last permit issued
Mar 30, 2026
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 30, 2026
Shut in
Mar 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
912381-99DrillPioneer Natural Res. USA, Inc.Dec 18, 2025Jan 21, 2026Feb 24, 202610,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 30, 2026Mabee E1M O-10-65119Spraberry (Trend Area)Pioneer Natural Res. USA Inc.Shut In · shut in Mar 1, 20268,273

Formation tops

As filed on W-2/G-1. Subsea from 2,827 ft elevation.Download CSV →

FormationMD ftSubsea
Santa Rosa1,3171,510
Yates2,73691
Queen3,676-849
Grayburg4,008-1,181
San AndresSAN ANDRES - ACTIVE CO2 FLOOD; H4,343-1,516
Clear ForkCLEARFORK6,562-3,735
Spraberry7,759-4,932
Cisco——
Dean——
Wolfcamp——

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,76817.51,875 S
9.6256,00112.251,915 S
5.518,1748.751,190 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 2, 2026May 12, 2026Yes

Well logs

1 log loaded from the RRC's log index, 1 of it with a digital LAS file, the latest received May 1, 2026. While drilling (MWD). These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
Measure While Drilling (MWD)Spans Santa Rosa, Yates, Queen, Grayburg, San Andres, Clear Fork, SpraberryLAS + TIFF1,737 to 18,189May 1, 20265.69 + 2.55

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it. The University Lands library has no per-well link: then paste it into its search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31747153, documented in the API reference.