TEXAS · WELLS · MATAGORDA COUNTY · OHIO-SUN UNIT LEASE · API 42-321-00371 · DISTRICT 03

Ohio-Sun Unit #1N

Shut in

Matagorda County · Markham N.-Bay City N(cornelius) field · Shut In  · Vertical

Ohio-Sun Unit #1N (API 42-321-00371) is a well in Matagorda County operated by Goldking Minerals Mgmt L.L.C., completed August 18, 2010 and listed as shut in on the RRC schedule, shut in January 1, 2000.

The RRC has issued 4 drilling permits between 1977 and 1985, permitted to 8,850 ft.

It was permitted by Marathon Oil Company and has since transferred to Goldking Minerals Mgmt L.L.C. on the wellbore schedule.

Completion filings report 3 formation tops, including Miocene (undifferentiated), Anahuac, Frio.

Its lease has reported 1.05M barrels of oil and 1.25M mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 53 wells, so these are lease totals, not this well alone.

Operator of record

Goldking Minerals Mgmt L.L.C.

Permitted by Marathon Oil Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 10, 2026
Permits on file
1
Phone
(713) 228-5464

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGoldking Minerals Mgmt L.L.C.
Production reportsAllegiant Resources, LLCthrough Apr 2026
Latest permitMarathon Oil CompanyJan 25, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,850
total depth, ft
4
permits on file
Jan 25, 1985
last permit issued
Aug 18, 2010
completed
1.05M
cumulative oil, bbl
1.25M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 18, 2010
Shut in
Jan 1, 2000
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 53 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ohio-Sun Unit O-3-2998Markham N.-Bay City,n(cornelius)Allegiant Resources, LLC531.05M1.25MJan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 9,602 · prior 12 10,776(-11%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 3,577 · prior 12 6,248(-43%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyJan 1993 → Nov 2002
  2. 2Comstock Oil & Gas, Inc.Dec 2002 → Oct 2004
  3. 3Comstock Oil & Gas, LPNov 2004 → Aug 2008
  4. 4Premier Natural Resources, LLCSep 2008 → Sep 2015
  5. 5Remora Management, LLCOct 2015 → Jul 2019
  6. 6Allegiant Resources, LLCAug 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
265221-99RecompletionMarathon Oil CompanyJan 25, 1985Jan 25, 1985—8,850
247111-99RecompletionMarathon Oil CompanyAug 1, 1984Aug 1, 1984—8,850
176999-99RecompletionMarathon Oil CompanyNov 9, 1982Nov 9, 1982—8,850
5745-99RecompletionMarathon Oil CompanyAug 10, 1977Aug 10, 1977—8,850

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 18, 2010Ohio-Sun Unit O-3-2998Markham N.-Bay City N(cornelius)Goldking Minerals Mgmt L.L.C.Shut In · shut in Jan 1, 20008,850
Aug 8, 1984Ohio-Sun Unit O-3-2999Markham N.-Bay City N (McDonald)Goldking Minerals Mgmt L.L.C.Not on Schedule—
Feb 3, 1983Ohio-Sun Unit O-3-10611Markham N.-Bay City N (7500 A)Goldking Minerals Mgmt L.L.C.Not on Schedule—
Feb 3, 1983Ohio-Sun Unit O-3-10611Markham N.-Bay City N (7500 A)Goldking Minerals Mgmt L.L.C.Not on Schedule—
—Ohio-Sun Unit O-3-10525Markham N.-Bay City N (7150-A)Goldking Minerals Mgmt L.L.C.Not on Schedule—
—Ohio Sun Unit G-3-7295Markham N.-Bay City N (W. 1 UP)Marathon Oil CompanyNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 76 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE2,500-2,424
Anahuac5,500-5,424
Frio6,500-6,424

Perforations

Perforated and open-hole intervals.

FromToType
7,140—Perforated
7,4988,786Perforated
7,7787,788Perforated
8,4318,437Perforated
8,5828,597Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3757817.2550 S
9.6251,44112.25400 S
2.3757,100——
2.8757,432——
2.3758,668——
5.58,8508.625500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 20, 2010Sep 14, 2010—
00Feb 2, 2009Dec 9, 2008—
00Jun 4, 1986Mar 29, 1985Yes
00Apr 25, 1985——
00Sep 13, 1984Aug 28, 1984—
00Sep 7, 1984Aug 28, 1984—
00Jan 12, 1984Sep 1, 1977—
00Jan 12, 1984Jan 31, 1977—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.