WELL · 42-321-01646 · DISTRICT 3
Thompson J.E. #2
Matagorda County · Lucky ( Badough) field · Vertical
Thompson J.E. #2 (API 42-321-01646) is a plugged well in Matagorda County, plugged December 31, 1996, last operated by Smith Production Inc..
The RRC has issued 2 drilling permits between 1981 and 1991, permitted to 9,351 ft.
Its 2 leases have reported 578 barrels of oil and 2.46K mcf of gas since January 1993, last reporting in March 2008. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- The Woodlands, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 12, 2025
- Permits on file
- 433
- Phone
- (281) 296-5600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Smith Production Inc. |
| Production reports | Smith Production Inc.through Aug 1993 |
| Latest permit | Smith Production Inc.Dec 4, 1991 |
- 9,351
- total depth, ft
- 2
- permits on file
- Dec 4, 1991
- last permit issued
- Jun 6, 1991
- completed
- 578
- cumulative oil, bbl
- 2.46K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 6, 1991
- Shut in
- —
- Plugged
- Dec 31, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Thompson, J.E. O-3-17376 | Lucky ( Badough) | Smith Production Inc. | 2 | 578 | 2.46K | Jan 1993 – Mar 2008 |
| — O-3-6230 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Smith Production Inc.Jan 1993 → Aug 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 393892-99 | Recompletion | Smith Production Inc. | Nov 20, 1991 | Dec 4, 1991 | Apr 15, 1991 | 9,351 |
| 132043-99 | Recompletion | Amoco Production Company | Sep 2, 1981 | Sep 2, 1981 | — | 9,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 6, 1991 | Thompson J.E. O-3-17376 | Lucky ( Badough) | Smith Production Inc. | Plugged | — |
| Oct 7, 1981 | Thompson J. E. O-3-6230 | Lucky ( Gola) | Smith Production Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,554 | 8,560 | Perforated |
| 9,159 | 9,184 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 60 | 20 | 75 S |
| 10.75 | 1,211 | — | 75 S |
| 10.75 | 1,211 | 14.75 | 528 S |
| 5.5 | 9,078 | 9.875 | 528 S |
| 5.5 | 9,078 | — | 528 S |
| 2.375 | 9,241 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 15, 1992 | Apr 14, 1992 | Yes |
| 00 | Apr 27, 1992 | Oct 14, 1981 | — |
| 00 | Jan 12, 1984 | Oct 14, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-321-01646 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-321-01646 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32101646, documented in the API reference.