WELL · 42-321-30242 · DISTRICT 3
Savage Stewart #6
Matagorda County · Wadsworth (Savage) field · Vertical
Savage Stewart #6 (API 42-321-30242) is a plugged well in Matagorda County, plugged March 25, 2014, last operated by Mobil Producing TX. & N.M. Inc..
The RRC has issued one drilling permit, issued April 27, 1988, permitted to 10,010 ft.
Its 2 leases have reported 7 barrels of oil since January 1993, last reporting in August 2014.
Operator of record
Mobil Producing TX. & N.M. Inc.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 4, 2025
- Permits on file
- 6,763
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mobil Producing TX. & N.M. Inc. |
| Production reports | Alltex Exploration, Inc.through Dec 1998 |
| Latest permit | Mobil Producing TX. & N.M. Inc.Apr 27, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,010
- total depth, ft
- 1
- permits on file
- Apr 27, 1988
- last permit issued
- May 24, 1988
- completed
- 7
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 24, 1988
- Shut in
- —
- Plugged
- Mar 25, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Savage, Stewart O-3-20889 | Wadsworth (Savage) | Alltex Exploration, Inc. | 1 | 7 | 0 | Jan 1993 – Aug 2014 |
| — G-3-127514 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Alltex Exploration, Inc.Dec 1998 → Dec 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 345703-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Apr 26, 1988 | Apr 27, 1988 | — | 10,010 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-127514 | — | — | — | — |
| — | — O-3-20889 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,666 | 8,672 | Perforated |
| 8,681 | 8,698 | Perforated |
| 9,546 | 9,552 | Perforated |
| 9,568 | 9,580 | Perforated |
| — | 8,914 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,325 | 12.25 | 500 S |
| 9.625 | 1,325 | 13 | 500 S |
| 9.625 | 1,325 | — | — |
| 5.5 | 9,960 | 8.75 | 650 S |
| 5.5 | 9,960 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 31, 1999 | Mar 22, 1999 | — |
| 00 | Feb 13, 1991 | Oct 9, 1990 | — |
| 00 | Feb 1, 1991 | — | — |
| 00 | Jul 11, 1988 | Jun 20, 1988 | Yes |
| 00 | Jun 30, 1988 | — | — |
| 00 | Jan 12, 1984 | Jun 20, 1973 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-321-30242 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-321-30242 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32130242, documented in the API reference.