WELL · 42-321-30526 · DISTRICT 3

Ralph Peterson et al Gas Unit #1

Shut in

Matagorda County · Rugeley S.W. (12600) field · Temp Abandoned  · Vertical

Ralph Peterson ET AL Gas Unit #1 (API 42-321-30526) is a well in Matagorda County operated by Hilcorp Energy Company, completed July 20, 2013 and listed as temp abandoned on the RRC schedule, shut in February 1, 2010.

The RRC has issued 2 drilling permits between 1978 and 2013, permitted to 13,311 ft.

Completion filings report 2 formation tops, including Anahuac, Frio.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Mar 2010
Latest permitHilcorp Energy CompanyMay 30, 2013
13,311
total depth, ft
2
permits on file
May 30, 2013
last permit issued
Jul 20, 2013
completed
0
cumulative oil, bbl
3.01M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 20, 2013
Shut in
Feb 1, 2010
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Peterson, Ralph et AL G-3-75192Rugeley, SW. (12850)Hilcorp Energy Company103.01MJan 1993 – Jul 2026
Ralph Peterson, et al Gas Unit G-3-277945Rugeley, S.W. (12600)Hilcorp Energy Company100Sep 2013 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Union Oil Company of CaliforniaJan 1993 → Oct 1998
  2. 2Synergy Oil & Gas, Inc. (A)Nov 1998 → Aug 2001
  3. 3Penn Virginia Oil & Gas Corp.Sep 2001 → Mar 2005
  4. 4Penn Virginia Oil & Gas, L.P.Apr 2005 → Jan 2010
  5. 5Hilcorp Energy CompanyFeb 2010 → Mar 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
763400-99RecompletionHilcorp Energy CompanyMay 24, 2013May 30, 2013May 29, 201313,311
17575-99DrillPrairie Producing CompanyFeb 3, 1978Feb 3, 1978—13,311

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 20, 2013Ralph Peterson et al Gas Unit G-3-277945Rugeley S.W. (12600)Hilcorp Energy CompanyTemp Abandoned13,311
Aug 17, 1977Peterson Ralph et AL G-3-75192Rugeley SW. (12850)Hilcorp Energy CompanyTemp Abandoned · shut in Feb 1, 201013,311

Formation tops

As filed on W-2/G-1. Subsea from 29 ft elevation.Download CSV →

FormationMD ftSubsea
AnahuacTOP ANAHUAC SHALE7,470-7,441
FrioTOP FRIO9,400-9,371

Perforations

Perforated and open-hole intervals.

FromToType
12,85112,911Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.753,01314.751,635 S
7.62511,7189.875956 S
5.512,8486.5200 S
3.513,311——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 28, 2015Nov 5, 2013—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32130526, documented in the API reference.