TEXAS · WELLS · MATAGORDA COUNTY · API 42-321-31329 · DISTRICT 03

Ohio-Sun Unit #28J

Shut in

Matagorda County · Markham N.-Bay City N(cornelius) field · Shut In  · Vertical

Ohio-Sun Unit #28J (API 42-321-31329) is a well in Matagorda County operated by Goldking Minerals Mgmt L.L.C., completed February 25, 1991 and listed as shut in on the RRC schedule, shut in March 1, 2020.

The RRC has issued 4 drilling permits between 1983 and 1991, permitted to 8,642 ft.

It was permitted by Marathon Oil Company and has since transferred to Goldking Minerals Mgmt L.L.C. on the wellbore schedule.

Completion filings report 3 formation tops, including Miocene (undifferentiated), Anahuac, Frio.

Its 2 leases have reported 1.8M barrels of oil and 1.71M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 80 wells, so these are lease totals, not this well alone.

Operator of record

Goldking Minerals Mgmt L.L.C.

Permitted by Marathon Oil Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 10, 2026
Permits on file
1
Phone
(713) 228-5464

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGoldking Minerals Mgmt L.L.C.
Production reportsAllegiant Resources, LLCthrough Apr 2026
Latest permitMarathon Oil CompanyFeb 22, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,642
total depth, ft
4
permits on file
Feb 22, 1991
last permit issued
Feb 25, 1991
completed
1.8M
cumulative oil, bbl
1.71M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 25, 1991
Shut in
Mar 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 80 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ohio-Sun Unit O-3-2997Markham N.-Bay City, N (Cayce)Allegiant Resources, LLC27752K455KJan 1993 – Apr 2026
Ohio-Sun Unit O-3-2998Markham N.-Bay City,n(cornelius)Allegiant Resources, LLC531.05M1.25MJan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 12,705 · prior 12 13,001(-2%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 3,584 · prior 12 9,844(-64%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marathon Oil CompanyJan 1993 → Nov 2002
  2. 2Comstock Oil & Gas, Inc.Dec 2002 → Oct 2004
  3. 3Comstock Oil & Gas, LPNov 2004 → Aug 2008
  4. 4Premier Natural Resources, LLCSep 2008 → Sep 2015
  5. 5Remora Management, LLCOct 2015 → Jul 2019
  6. 6Allegiant Resources, LLCAug 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
384987-99RecompletionMarathon Oil CompanyFeb 22, 1991Feb 22, 1991Feb 21, 19918,640
357248-99RecompletionMarathon Oil CompanyMar 21, 1989Mar 27, 1989—8,642
349693-99RecompletionMarathon Oil CompanyAug 3, 1988Aug 4, 1988—8,642
206339-99DrillMarathon Oil CompanyAug 12, 1983Aug 16, 1983—8,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 25, 1991Ohio-Sun Unit O-3-2998Markham N.-Bay City N(cornelius)Goldking Minerals Mgmt L.L.C.Shut In · shut in Mar 1, 20208,642
Apr 27, 1989Ohio-Sun Unit O-3-2997Markham N.-Bay City N (Cayce)Goldking Minerals Mgmt L.L.C.Not on Schedule—
Jan 6, 1989Ohio-Sun Unit O-3-2999Markham N.-Bay City N (McDonald)Goldking Minerals Mgmt L.L.C.Not on Schedule—
Jan 6, 1989Ohio-Sun Unit O-3-2999Markham N.-Bay City N (McDonald)Goldking Minerals Mgmt L.L.C.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 58 ft elevation.Download CSV →

FormationMD ftSubsea
Miocene (undifferentiated)MIOCENE2,500-2,442
Anahuac5,500-5,442
Frio6,500-6,442
Frio6,900-6,842

Perforations

Perforated and open-hole intervals.

FromToType
7,7367,741Perforated
7,8367,841Perforated
7,9147,920Perforated
8,3728,381Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,64012.25715 S
2.8758,300——
5.58,6408.751,820 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 1, 1991Mar 5, 1991Yes
00Mar 13, 1991May 23, 1989Yes
00Jun 7, 1989May 23, 1989Yes
00Jun 2, 1989——
00Mar 17, 1989Feb 22, 1989Yes
00Jan 12, 1984Oct 25, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32131329, documented in the API reference.