WELL · 42-321-31434 · DISTRICT 3
Cornelius A #1
Matagorda County · Wadsworth (Savage) field · Vertical
Cornelius A #1 (API 42-321-31434) is a plugged well in Matagorda County, plugged November 24, 1993, last operated by Shana Petroleum Company.
The RRC has issued 2 drilling permits between 1985 and 1987, permitted to 10,000 ft.
It was permitted by Txo Production Corp. and has since transferred to Shana Petroleum Company on the wellbore schedule.
Completion filings report 2 formation tops, including Miocene (undifferentiated), Frio.
Operator of record
Permitted by TXO Production Corp.; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jul 2, 2001
- Permits on file
- 208
- Phone
- (214) 692-9211
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Shana Petroleum Company |
| Production reports | none |
| Latest permit | TXO Production Corp.Jul 23, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 2
- permits on file
- Jul 23, 1987
- last permit issued
- Jul 24, 1987
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 24, 1987
- Shut in
- —
- Plugged
- Nov 24, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cornelius "A" G-3-124761 | Wadsworth (Savage) | Shana Petroleum Company | 1 | 0 | 0 | Jan 1993 – Nov 1993 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 333233-99 | Recompletion | TXO Production Corp. | Jul 21, 1987 | Jul 23, 1987 | — | 10,000 |
| 264555-99 | Drill | TXO Production Corp. | Jan 14, 1985 | Jan 21, 1985 | — | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-124761 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 29 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)TOP OF MIOCENE | 2,000 | -1,971 |
| FrioTOP OF FRIO | 9,600 | -9,571 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,506 | 9,518 | Perforated |
| 9,652 | 9,657 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,032 | 12.25 | 835 S |
| 2.875 | 9,822 | 7.875 | 215 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 20, 1987 | Aug 3, 1987 | Yes |
| 00 | Aug 11, 1987 | — | — |
| 00 | Mar 19, 1985 | Feb 19, 1985 | — |
| 00 | Mar 16, 1985 | Feb 11, 1985 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-321-31434 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-321-31434 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32131434, documented in the API reference.