WELL · 42-323-32810 · DISTRICT 1

Cage-Kirk B21 #121H

Plugged

Maverick County · Comanche-Halsell (6500) field  · Horizontal · Directional

Cage-Kirk B21 #121H (API 42-323-32810) is a plugged horizontal well in Maverick County, plugged June 6, 2019, last operated by El Toro Resources LLC.

The RRC has issued one drilling permit (amended twice), issued July 12, 2005, permitted to 7,000 ft.

It was permitted by Exploration Company, The and has since transferred to El Toro Resources LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Anacacho, Austin Chalk, Del Rio, Georgetown.

Its lease has reported 55.7K barrels of oil since August 2005, last reporting in September 2019.

Operator of record

EL Toro Resources LLC

Permitted by Exploration Company, The; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Feb 10, 2026
Permits on file
114
Phone
(405) 242-2777

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEL Toro Resources LLC
Production reportsEL Toro Resources LLCthrough Mar 2019
Latest permitExploration Company, TheJul 12, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
3
permits on file
Jul 12, 2005
last permit issued
Aug 17, 2005
completed
55.7K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2005 THROUGH Sep 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 17, 2005
Shut in
—
Plugged
Jun 6, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cage-Kirk B21 O-1-14772Comanche-Halsell (6500)EL Toro Resources LLC155.7K0Aug 2005 – Sep 2019

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exploration Company, TheAug 2005 → Jun 2007
  2. 2Txco Resources Inc.Jul 2007 → Feb 2010
  3. 3Newfield Exploration CompanyMar 2010 → May 2015
  4. 4EL Toro Resources LLCJun 2015 → Mar 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
603195-97DrillExploration Company, TheDec 5, 2006Jul 12, 2005Jul 11, 20057,000
603195-98DrillExploration Company, TheFeb 28, 2006Jul 12, 2005—7,000
603195-99DrillExploration Company, TheJul 8, 2005Jul 12, 2005—7,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 17, 2005Cage-Kirk B21 O-1-14772Comanche-Halsell (6500)EL Toro Resources LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 829 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho2,250-1,421
Austin Chalk3,495-2,666
Del Rio4,850-4,021
Georgetown5,030-4,201
Mc Knight5,720-4,891
Edwards6,145-5,316

Perforations

Perforated and open-hole intervals.

FromToType
6,8137,544Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62526312.25180 S
5.56,8137.751,275 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 2, 2007Sep 7, 2005Yes
00Feb 9, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32332810, documented in the API reference.