WELL · 42-323-32851 · DISTRICT 1

Cage-Briscoe B 146 Unit #146H

Plugged

Maverick County · Comanche-Halsell (6500) field  · Horizontal

Cage-Briscoe B 146 Unit #146H (API 42-323-32851) is a plugged horizontal well in Maverick County, plugged February 27, 2014, last operated by Newfield Exploration Company.

The RRC has issued one drilling permit (amended 3 times), issued February 17, 2006, permitted to 7,100 ft.

It was permitted by Exploration Company, The and has since transferred to Newfield Exploration Company on the wellbore schedule.

Completion filings report 6 formation tops, including Austin Chalk, Eagle Ford, Buda, Del Rio.

Its lease has reported 124K barrels of oil since March 2006, last reporting in August 2014.

Operator of record

Newfield Exploration Company

Permitted by Exploration Company, The; the EWA schedule now lists a different operator.

Based in
The Woodlands, TX
P-5 status
Delinquent (D)
P-5 last filed
Sep 2, 2022
Permits on file
821
Phone
(281) 210-5100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNewfield Exploration Company
Production reportsNewfield Exploration Companythrough Jan 2014
Latest permitExploration Company, TheFeb 17, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,100
total depth, ft
4
permits on file
Feb 17, 2006
last permit issued
Mar 25, 2006
completed
124K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2006 THROUGH Aug 2014

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 25, 2006
Shut in
—
Plugged
Feb 27, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cage-Briscoe B 146 Unit O-1-14775Comanche-Halsell (6500)Newfield Exploration Company1124K0Mar 2006 – Aug 2014

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exploration Company, TheMar 2006 → Jun 2007
  2. 2Txco Resources Inc.Jul 2007 → Feb 2010
  3. 3Newfield Exploration CompanyApr 2010 → Jan 2014

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
614466-96DrillExploration Company, TheJan 24, 2007Feb 17, 2006Feb 18, 20067,100
614466-97DrillExploration Company, TheOct 18, 2006Feb 17, 2006Feb 18, 20067,100
614466-98DrillExploration Company, TheAug 21, 2006Feb 17, 2006Feb 18, 20067,100
614466-99DrillExploration Company, TheFeb 17, 2006Feb 17, 2006Feb 18, 20067,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-14775————

Formation tops

As filed on W-2/G-1. Subsea from 801 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk3,382-2,581
Eagle FordEAGLEFORD4,135-3,334
Buda4,719-3,918
Del Rio4,870-4,069
Georgetown5,073-4,272
McKnight5,667-4,866

Perforations

Perforated and open-hole intervals.

FromToType
6,9757,648Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
5.13822512.251,600 S
5.56,3007.875475 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 1, 2007Apr 12, 2006Yes
00Feb 20, 2007——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32332851, documented in the API reference.