TEXAS · WELLS · MAVERICK COUNTY · API 42-323-33466 · DISTRICT 01

El Indio Town #1D

N

Maverick County  · Vertical

El Indio Town #1D (API 42-323-33466) is a former disposal or injection well in Maverick County, last operated by Bellows Operating CO., L. C.; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued October 22, 2014, permitted to 3,500 ft.

Operator of record

Bellows Operating Co., L. C.

Based in
Goliad, TX
P-5 status
Delinquent (D)
P-5 last filed
Sep 1, 2016
Permits on file
12
Phone
(361) 645-8613

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitBellows Operating Co., L. C.Oct 22, 2014
3,500
total depth, ft
1
permits on file
Oct 22, 2014
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
798737-99DrillBellows Operating Co., L. C.Oct 21, 2014Oct 22, 2014—3,500

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Mar 2018
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000112464W-14 DisposalCanceled Nov 30, 201810,0001,0002,000–3,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120172018

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32333466, documented in the API reference.