TEXAS · WELLS · MENARD COUNTY · API 42-327-00002 · DISTRICT 6E
Wilkinson #2
Menard County · Menard (Canyon Lime) field · Vertical
Wilkinson #2 (API 42-327-00002) is a plugged well in Menard County, plugged October 6, 1993, last operated by Walsh & Watts Inc..
The RRC has issued one drilling permit, issued March 9, 1993, permitted to 1,600 ft.
It was permitted by Brooker-Tse Operations and has since transferred to Walsh & Watts Inc. on the wellbore schedule.
Operator of record
Permitted by Brooker-Tse Operations; the EWA schedule now lists a different operator.
- Based in
- Aledo, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 2, 2025
- Permits on file
- 361
- Phone
- (469) 428-3381
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Walsh & Watts Inc. |
| Production reports | none |
| Latest permit | Brooker-Tse OperationsMar 9, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,600
- total depth, ft
- 1
- permits on file
- Mar 9, 1993
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Oct 6, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 409299-99 | Reenter | Brooker-Tse Operations | Feb 24, 1993 | Mar 9, 1993 | Mar 30, 1993 | 1,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | Wilkinson G-9-19007 | Menard (Canyon Lime) | Walsh & Watts Inc. | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,680 | 2,911 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 265 | 12.5 | 150 S |
| 5.5 | 3,033 | 7.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jul 22, 1971 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-327-00002 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-327-00002 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32700002, documented in the API reference.