WELL · 42-329-01596 · DISTRICT 7

Tippett June #10

Plugged

Midland County · Spraberry (Trend Area) field  · Vertical

Tippett June #10 (API 42-329-01596) is a plugged well in Midland County, plugged May 15, 2025, last operated by Apache Corporation.

The RRC has issued 2 drilling permits between 1981 and 1998, permitted to 10,850 ft.

It was permitted by Arco Permian and has since transferred to Apache Corporation on the wellbore schedule.

Its 2 leases have reported 2.31M barrels of oil and 6.09M mcf of gas since January 1993, last reporting in July 2026. The leases carry 46 wells, so these are lease totals, not this well alone.

Operator of record

Apache Corporation

Permitted by Arco Permian; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,756
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsApache Corporationthrough Apr 2026
Latest permitArco PermianNov 9, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,850
total depth, ft
2
permits on file
Nov 9, 1998
last permit issued
Oct 16, 1998
completed
2.31M
cumulative oil, bbl
6.09M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 16, 1998
Shut in
—
Plugged
May 15, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 46 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tippett, June O-10-34447Spraberry (Trend Area)Apache Corporation412.27M6.02MMar 1995 – Jul 2026
Tippett, June O-9-3955Pegasus (Spraberry)Arco Permian541.8K69.7KJan 1993 – Jul 2000

Oil, barrels lease total

Last 12 months 24,379 · prior 12 41,282(-41%)

05K10K202420252026

Gas, mcf lease total

Last 12 months 45,521 · prior 12 70,399(-35%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arco Oil & Gas Co.Jan 1993 → May 1994
  2. 2Arco PermianJun 1994 → Dec 2001
  3. 3BP America Production CompanyJan 2002 → Nov 2010
  4. 4Apache CorporationDec 2010 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
480695-99RecompletionArco PermianNov 6, 1998Nov 9, 1998Sep 21, 199810,850
134921-99RecompletionArco Oil & Gas Co.Sep 29, 1981Sep 29, 1981—10,850

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-3955————
—— O-10-34447————

Perforations

Perforated and open-hole intervals.

FromToType
7,7307,917Perforated
8,5408,560Perforated
9,4609,480Perforated
9,4909,500Perforated
10,143—Perforated
—10,470Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37536117.25350 S
13.37536117.5350 S
9.6254,85012.52,800 S
2.3757,634——
710,8498.75550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 10, 1999Feb 16, 1999—
00Dec 18, 1998Apr 21, 1982—
00Jan 12, 1984Apr 21, 1982—
00Jan 12, 1984Aug 8, 1977—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32901596, documented in the API reference.